12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Highway Safety Improvement ProjectsFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq # ATPRouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1674 M MN 65 0208-132 MN/DOT 169TH AVE NE, HAM LAKE-CONVERT0.8 SH GRADE AND HSIP 1,035,000 931,500 00 103,500 0INTERSECTION TO A DIRECTIONAL CROSSOVERSURFACEWITH MEDIAN U-TURNS2161 C TH 999 8816-1654 MNDOT TOWARDS ZERO DEATH (TZD) BEHAVIORAL0.0 SH MISCELLANEOUS HSIP 11,111 10,000 00 0 1,111STRATEGY PROGRAM EVALUATION2162 C TH 999 8816-1655 MNDOT TOWARDS ZERO DEATH (TZD) ENFORCEMENT 0.0 SH MISCELLANEOUS HSIP 405,556 365,000 00 0 40,5562163 C TH 999 8816-1656 MNDOT TOWARDS ZERO DEATH (TZD) EDUCATION 0.0 SH MISCELLANEOUS HSIP 400,000 360,000 00 0 40,0002164 C TH 999 8816-1657 MNDOT TOWARDS ZERO DEATH (TZD) REGIONAL0.0 SH MISCELLANEOUS HSIP 333,333 300,000 00 0 33,333COORDINATORS2176 C TH 999 880C-HSP-12 MNDOT STRATEGIC HIGHWAY SAFETY PLAN - LOW COST 0.0 SH MEDIAN BARRIER HSIP 495,000 495,000 00 0 0SAFETY IMPROVEMENTS$24,260,890 $20,388,130 $918,000$0 $1,192,481 $2,680,279September 2011HSIP Project Listing A-3 Page 6 of 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!