12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 3Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other433 PED/BIKE 162-090-005 ST CLOUD EXTEND BEAVER ISLAND BIKE/PED TRAIL, ST CLOUD 0.2 EN PEDESTRIAN TEA 3,050,000 493,465 00 0 2,556,535CIVIC CENTER NORTH TO 5TH AVENUE ALONGBIKE TRAILMISSISSIPPI RIVER IN ST CLOUD434 MSAS 101 162-101-012AC ST CLOUD **MN122** 10TH ST BRIDGE APPROACH WORK, 5TH AVE 0.6 RC GRADE AND STP 601,439 601,439 00 0 0TO 1ST AVE (AC PAYBACK 1 OF 1)SURFACE435 CITY 230-113-001 BAXTER CONSTRUCT RAILROAD-HIGHWAY GRADE CROSSING ON 0.0 MC RAILROADSTP 303,000 242,400 00 0 60,600NEW ALIGNMENT AT CYPRESS DRIVE IN BAXTER, INCLSURF/SIGNALSSIGNAL & GATES436 I 94 242-010-003 ALBERTVILLE CONSTRUCT WRIGHT CSAH 19/37 COLLECTORDISTRIBUTOR INTERCHANGE INTERCONNECT INALBERTVILLE (CHAPTER <strong>15</strong>2 BOND GM INTERCHANGEPROGRAM; TRLF PROJECT FOR $4,113,700) ($5,440,000BOND DOLLARS ON ASSOC SP 8680-145)1.0 MC GRADE ANDSURFACETRLF 4,113,700 0 00 0 4,113,700437 MN 6 1802-48 MNDOT **BR4M** W. OF TH 210 IN CROSBY TO BR. #18001 OVER 4.6 RS MILL & OVERLAY STP 1,000,000 800,000 00 200,000 0THE MISSISSIPPI RIVER, MILL & OVERLAY438 US 10 7102-122 MNDOT 0.2 MI E OF JCT TH 24 IN CLEAR LAKE TO 0.2 MI W OF JCT 14.4 RC UNBONDED NHS 13,682,378 9,061,589 00 682,378 3,938,411TH 25 IN BIG LAKE (WB), UNBONDED CONCRETECONCRETEOVERLAY, INCL SHOULDER PAVING & RUMBLE STRIPSOVERLAY439 US 10 7102-128 MNDOT RAILROAD PREEMPTION UPGRADES AT MAIN ST AND AT 0.0 SC RR X-INGSF 300,000 0 00 300,000 0JACKSON ST IN ELK RIVERIMPROVEMENTS440 US 10 8001-38 MNDOT **ELLA** WADENA/OTTER TAIL CO LINE TO BEGIN 4-LANE 3.5 RS MILL ANDSF 1,298,209 0 00 1,298,209 0E OF WADENA, MILL & OVERLAY, PAVE SHOULDERS,OVERLAYUPGRADE PED RAMPS441 MN <strong>15</strong> 7321-47 MNDOT **BP09** CONSTRUCT NEW INTERCHANGE AT JCTSTEARNS CO. CSAH 120 IN ST. CLOUD & SARTELL, INCL.NEW BR #73017 (CHAPTER 36 BOND-GM INTERCHANGEPROGRAM)0.3 MC GRADE,SURFACE& BRIDGESB BF 17,500,000 0 00 4,500,000 13,000,000442 MN 18 0102-23 MNDOT REPLACE BR #762 OVER SEASTADE CREEK, 5.4 MI. W OF 0.0 BR BRIDGESF 265,000 0 00 265,000 0MALMOREPLACEMENT443 MN 22 7326-14 MNDOT JCT TH 55 IN EDEN VALLEY TO JCT TH 23 IN RICHMOND 10.2 RS MILL ANDSF 3,000,000 0 00 3,000,000 0(EXEMPT RP 162.088 TO 162.396, AND RP 166.026 TOOVERLAY166.172), MILL & OVERLAY INCL PAVE SHOULDERS444 MN 23 0503-75AC1 MNDOT JCT TH 95 E OF ST CLOUD TO JCT TH 25 IN FOLEY,CONSTRUCT 4-LANE EXPRESSWAY; AND CONSTRUCTBRIDGE #05017; AND FROM JCT TH 25 IN FOLEY TO 1.7 MIE, MILL AND OVERLAY, UPGRADE PED RAMPS (ACPAYBACK 1 OF 2)8.3 MC GRADE,SURFACE& BRIDGENHS <strong>15</strong>,834,444 <strong>15</strong>,834,444 00 0 0September 2011Project Listing Page III - 36 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!