12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1657 US 52 1906-55 MN/DOT MN 50 TO DAKOTA CSAH 47, HAMPTON-CONSTRUCTFRONTAGE RD, ACCESS CLOSURES, DRAINAGE,LIGHTING, SIGNING AND CONSTRUCT US52 RAMPS &LOOPS TO CSAH 47 OVERPASS("OLD"ACCESSMANAGEMENT FUNDS($910K) & <strong>2012</strong> SC ($191K )1.0 SC GRADE ANDSURFACESF LF 3,795,000 0 00 1,100,000 2,695,0001658 US 52 1907-73 MN/DOT INVER GROVE TR TO CONCORD BLVD IN INVER GROVE 0.6 SC GRADE AND SF 1,045,000 0 00 1,045,000 0HTS-CONSTRUCT W FRONTAGE RD, ACCESS CLOSURES,SURFACEDRAINAGE, POND1659 US 52 1928-63 MNDOT ALONG SOUTHVIEW BLVD (DAKOTA CSAH 14) IN SOUTHST. PAUL - NEW SIDEWALKS, ADA PEDESTRIAN RAMPSAND CONNECT TO EXISTING SIDEWALKS, RETAININGWALL0.0 AM PEDESTRIANBIKE TRAILSF 43,200 0 00 43,200 01660 US 52 1928-64 MN/DOT **BR4M**FROM MN55 TO I494 IN INVER GROVE HTS-BIT 4.0 RS MILL ANDNHS 4,350,000 3,480,000 00 870,000 0MILL & OVERLAY, DRAINAGE, ADA IMPROVEMENTS, ANDOVERLAYTMS1661 MN 55 2722-78 MN/DOT FROM TAMARACK RD TO EAST OF PINTODRIVE(HENNEPIN CSAH 1<strong>15</strong>/CR 116) IN MEDINA-SIGNALREVISIONS AND MEDIAN CLOSURES IN CONJUNCTIONWITH BACKAGE ROAD CONSTRUCTION0.6 AM GRADE ANDSURFACESF 500,000 0 00 500,000 01662 MN 55 2722-81 MN/DOT **BR4M**FROM ASH ST IN ROCKFORD TO JUST WEST OFHENNEPIN CR-116 (PINTO RD) IN MEDINA-BIT MILL ANDOVERLAY, TURN LANES, ADA IMPROVEMENTS,DRAINAGE, GUARDRAIL ($300K FROM DIST 3 IN OTHER;$1.3M DPS FUNDS IN OTHER)10.4 RS MILL ANDOVERLAYNHS DPS 9,350,000 6,200,000 00 1,550,000 1,600,0001663 MN 55 2723-117 MN/DOT DOUGLAS DR(HENNEPIN CSAH 102), GOLDEN VALLEY- 0.0 SC TRAFFIC SIGNAL SF LF 300,000 0 00 <strong>15</strong>0,000 <strong>15</strong>0,000REPLACE TRAFFIC SIGNALREVISION1664 MN 55 2724-120 MN/DOT FROM E 26TH ST TO E 50TH IN MINNEAPOLIS-UPGRADE 3.4 AM TRAFFIC SIGNAL SF 275,000 0 00 275,000 0SIGNAL SYSTEMS AND INSTALL NEW CONTROLLERS ANDREVISIONCABINETS1665 US 61 6222-165 MN/DOT NORTH OF MN96 IN WHITE BEAR LAKE TO SOUTH OF TH97 IN FOREST LAKE-MILL & OVERLAY, REPLACE TRAFFICSIGNAL AT BUFFALO ST, DRAINAGE & GUARDRAILIMPROVEMENTS10.8 RS MILL ANDOVERLAYNHS LF 5,7<strong>15</strong>,000 4,470,000 00 1,117,500 127,5001666 US 61 8206-41 MNDOT AT WASHINGTON CSAH 4(170TH ST) IN HUGO-0.4 SH SPOTHSIP 1,998,080 1,198,080 00 445,000 355,000CONSTRUCT TRAFFIC SIGNAL, ADD TURN LANES,IMPROVEMENTDRAINAGE, ADA IMPROVEMENTS AND GUARDRAIL1667 MN 62 2774-20 MN/DOT FROM MN100 IN EDINA TO PENN AVE IN2.2 SC LIGHTINGSF 525,000 0 00 525,000 0RICHFIELD/MINNEAPOLIS- REPLACE LIGHTINGSeptember 2011Project Listing Page III - 125 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!