12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 3Fiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other517 US 10 7101-61M MNDOT SHERBURNE/ANOKA COUNTY LINE TO JCT TH 169 S IN 3.2 RS MILL ANDSF 3,977,047 0 00 3,977,047 0ELK RIVER, MILL & OVERLAY, PAVE SHOULDERSOVERLAY518 MN <strong>15</strong> 7321-48 MNDOT INSTALL TRAFFIC QUEUE DETECTION SYSTEM BETWEEN 0.5 SH TRAFFIC SIGNAL HSIP 200,000 180,000 00 20,000 03RD ST. AND 8TH ST. IN ST. CLOUD (HSIP PROJECT)REVISION519 MN 23 0503-75AC2 MNDOT JCT TH 95 E OF ST CLOUD TO JCT TH 25 IN FOLEY,CONSTRUCT 4 LANE; AND FROM JCT TH 25 IN FOLEY TO1.7 MI E, MILL & OVERLAY, UPGRADE RAMPS (ACPAYBACK, 2 of 2)10.8 MC GRADE,SURFACE& BRIDGENHS 4,827,778 4,827,778 00 0 0520 MN 23 8823-242 MNDOT UPGRADE SIGNING FROM PAYNESVILLE TO RICHMOND 53.0 SC SIGNINGSF 400,000 0 00 400,000 0AND MILACA TO TH 107521 MN 28 7307-12 MNDOT POPE/STEARNS CO LN TO S JCT TH 71, MILL & OVERLAY, 9.0 RS MILL ANDSF 2,298,292 0 00 2,298,292 0PAVE SHOULDERSOVERLAY522 MN 47 3002-13 MNDOT INSTALL TRAFFIC SIGNAL AT JCT TH 95 IN ISANTI CO 0.6 SH INTERSECTION HSIP 600,000 540,000 00 60,000 0(HSIP PROJET)IMPROVEMENT523 I 94 8680-<strong>15</strong>8 MNDOT **ELLA** CONSTRUCT WB RIGHT SHOULDER AUXILIARY 1.3 SC GRADE AND IM 2,940,000 2,646,000 00 294,000 0LANE BETWEEN WRIGHT CSAH 18 TO TH 25 ATSURFACEMONTICELLO524 I 94 8680-162 MNDOT ON WBL, FM CROW RIVER BRIDGE (BR #27942) ATWRIGHT/HENNEPIN CO LINE TO ENTRANCE RAMP AT TH25 IN MONTICELLO; ON EBL, FM EB EXIT RAMP AT TH 25TO BR #86819; AND FROM EXIT RAMP AT WRIGHT CSAH 19TO ENTRANCE RAMP AT CSAH 37 IN ALBERTVILLE,BITUMINOUS OVERLAY11.7 RS BITUMINOUSOVERLAYIM 6,721,455 6,049,310 00 672,145 0525 MN 95 8823-248 MNDOT SIGN REPLACEMENT FROM JCT. TH 23 TO52.2 SC SIGNINGSF 400,000 0 00 400,000 0ISANTI/CHISAGO LINE526 US 169 4812-82 MNDOT ON NBL, FROM 0.7 MI. N. OF MILLE LACS CO. CSAH 9 N. OF 16.9 RS MILL ANDSF 2,950,806 0 00 2,950,806 0MILACA TO 0.2 MI. N. OF MILLE LACS CO. CR 103 S. OFOVERLAYONAMIA, MILL & OVERLAY527 US 169 4812-83 MNDOT ON SBL, FM 0.6 MI N OF MILLE LACS CO CSAH 36 TO9.8 RS MILL ANDNHS 2,727,397 2,181,918 00 545,479 0BEGIN CONCRETE SECTION N OF RUM RIVER RESTOVERLAYAREA, BITUMINOUS OVERLAY528 MN 999 8823-140 MNDOT DISTRICTWIDE RR PRE-EMPTION UPGRADE PROJECT 0.0 SC TRAFFIC SIGNAL SF 300,000 0 00 300,000 0REVISION529 MN 999 8803-ADA-13 MNDOT **ADA** DISTRICTWIDE SETASIDES ADA IMPROVEMENTS - 0.0 NA SPOTSTP 250,000 200,000 00 50,000 02013IMPROVEMENT530 MN 999 8803-RW-13 MNDOT DISTRICTWIDE SET ASIDES - RIGHT-OF-WAY - 20130.0 RW RIGHT OF WAY SF 4,100,000 0 00 4,100,000 0September 2011Project Listing Page III - 42 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!