12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 8Fiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1364 BB TRS-7311-13 MNDOT TRAILBLAZER, PURCHASE 3 BUSES (CLASS 400)0.0 TR PURCHASE BUS STP 210,000 168,000 00 0 42,0001365 BB TRS-7340-13 MNDOT KANDIYOHI CO, PURCHASE 1 BUS (CLASS 500)0.0 TR PURCHASE BUS STP 1<strong>15</strong>,000 92,000 00 0 23,0001366 RR 34-00124 MNDOT KANDIYOHI MSAS 104, WILLMAR (TROTT AVE), INSTALL 0.0 SR RR X-INGRRS 285,000 256,500 00 0 28,500GATES (UPGRADE)IMPROVEMENTS1367 RR 41-00105 MNDOT LINCOLN CSAH 21 (BENTON ST), LAKE BENTON, INSTALL 0.0 SR RR X-INGRRS 325,000 292,500 00 0 32,500FOUR-GATE SYSTEMIMPROVEMENTS1368 CSAH 42 012-642-001 CHIPPEWA MAIN STREET (MONTEVIDEO) TO US 212, MINOR0.8 RC SURFACING STP 890,000 660,000 00 0 230,000COUNTY GRADING, SURFACING, & C&G1369 CSAH 10 042-610-034 LYON COUNTY US 59 TO COTTONWOOD, AGG BASE & SURFACING6.6 RC SURFACING STP 2,650,000 2,070,000 00 0 580,0001370 PED/BIKE 043-090-002 MCLEOD COUNTY MCLEOD CSAH 1 TO BUFFALO CREEK (BUFFALO1.7 EN PEDESTRIAN TEA 195,630 <strong>15</strong>6,500 00 0 39,130HIGHLAND RECREATIONAL TRAIL), GLENCOE PHASE 2,BIKE TRAILCONSTRUCT BIKE/PED TRAIL1371 CSAH <strong>15</strong> 064-6<strong>15</strong>-013 REDWOOD 1.0 MILES W. OF JCT. US 71, REPLACE BRIDGE #5812 0.2 BR BRIDGEBROS 1,<strong>15</strong>0,000 802,000 00 0 348,000COUNTY OVER COTTONWOOD RIVERREPLACEMENT1372 PED/BIKE 139-090-004 MARSHALL MN 19 TO CLARICE AVE (MARSHALL E TRAIL),1.2 EN PEDESTRIAN TEA 261,000 174,870 00 0 86,130CONSTRUCT BIKE/PED TRAIL (PHASE III)BIKE TRAIL1373 PED/BIKE 175-090-005 WILLMAR DOWNTOWN WILLMAR TO ROBBINS ISLAND1.0 EN PEDESTRIAN TEA 177,017 135,064 00 0 41,953CONNECTION, CONSTRUCT BIKE/PED TRAILBIKE TRAIL1374 MN 7 1201-30 MNDOT OVERLAY & PAVE SHLDS, MILAN TO MONTEVIDEO<strong>15</strong>.0 RS BITUMINOUS SF 2,3<strong>15</strong>,040 0 00 2,3<strong>15</strong>,040 0OVERLAY1375 MN 7 1201-31M MNDOT SWIFT/CHIPPEWA COUNTY LINE TO MILAN (DISTRICT 4 IS 4.0 RS BITUMINOUS NHS 1,245,816 996,653 00 249,163 0THE LEAD, THIS IS DISTRICT 8'S SHARE OF THEOVERLAYPROJECT), OVERLAY1376 MN 7 4703-26 MNDOT JCT MN 4 (COSMOS) TO W. JCT MN 22, MILL & OVERLAY 9.7 RS MILL ANDSTP 5,188,480 4,<strong>15</strong>0,784 00 1,037,696 0OVERLAY1377 US 12 3403-71 MNDOT 6TH STREET TO JCT US 71 (WILLMAR), CORRECT1.7 SC PED./BIKESTP 176,384 141,107 00 35,277 0SIDEWALKS AND PED REAMPS (ADA)IMPROVEMENT1378 US 12 4704-48 MNDOT 4TH ST TO DARWIN ST IN LITCHFIELD, UTBWC0.4 RS CONCRETE NHS <strong>15</strong>6,324 125,059 00 31,265 0PAVEMENTREHAB1379 US 12 4705-42 MNDOT E OF MEEKER CSAH 34 (LITCHFIELD) TO W OF MEEKER 4.6 RS MILL ANDNHS 2,094,560 1,675,648 00 418,912 0CSAH 24 (DARWIN), MILL & OVERLAYOVERLAYSeptember 2011Project Listing Page III - 104 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!