12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1821 I 35 1980-68AC2 MN/DOT **LGA** CSAH 70, LAKEVILLE-RECONSTRUCT0.4 RC GRADE,SURFACE NHS 2,410,000 2,410,000 00 0 0INTERCHANGE-DEBT MGMT(AC PAYBACK FROM FY 2008)& BRIDGE(PAYBACK 2 OF 2)1822 I 35E 1982-<strong>15</strong>8 MNDOT S JCT I35E/W IN BURNSVILLE TO MN77 IN EAGAN - SIGN 4.7 SC SIGNINGSF 350,000 0 00 350,000 0REPLACEMENT1823 I 35E 1982-161 MN/DOT FROM I35E/I35W SPLIT TO DAKOTA CSAH 11 INBURNSVILLE-REDECK AND APPROACH WORK ONBRIDGES 19893, 19809, 19811, 19812, 19889, 19866, 19813,19814, GUARDRAIL, PED RAMP UPGRADES2.5 BI BRIDGE REPAIROTHERIM 1,865,000 1,678,500 00 186,500 01824 I 35E 6280-308 MN/DOT UNIVERSITY AVE TO JUST NORTH OF MARYLAND AVE INST PAUL-RECONSTRUCT INCLUDING REPLACE EXISTINGINTERCHANGE AT PENNSYLVANIA AVE WITHINTERCHANGE AT CAYUGA ST, FRONTAGE ROADCONSTRUCTION, RETAINING WALLS, TRAILS ANDINCLUDING REPLACING 5 BRIDGES (NEW BR# 621.5 BR GRADE,SURFACE& BRIDGEBR BF 131,000,000 51,325,000 00 0 79,675,0001825 I 35E 6280-308RR MN/DOT UNIVERSITY AVE TO JUST NORTH OF MARYLAND AVE IN 1.5 BR RAILROADBF 2,100,000 0 00 0 2,100,000ST PAUL-RAILROAD AGREEMENTAGREEMENT1826 I 35E 6280-308RW3 MN/DOT **MN209** I-94 TO MARYLAND AVE, ST PAUL-RW &1.8 RW RIGHT OF WAY HPP 3,000,000 2,400,000 00 600,000 0RECONSTRUCTION (SAFETEA-LU)1827 I 35E 6280-308UT MN/DOT UNIVERSITY AVE TO JUST NORTH OF MARYLAND AVE IN 1.5 BR UTILITYBF 1,050,000 0 00 0 1,050,000ST PAUL-UTILITY RELOCATIONAGREEMENT1828 I 35W 0280-63 MNDOT E OF I-35W, N OF LAKE DR ALONG RESIDENTIAL AREA 0.8 NO NOISESF LF 2,070,000 0 00 1,865,000 205,000(MANUFACTURED HOME COMMUNITY), BLAINE - NOISEABATEMENTWALL1829 I 35W 1981-126 MNDOT FROM CRYSTAL LAKE RD (ON I-35) TO BURNSVILLE2.2 MC LANDSCAPING SF 70,000 0 00 70,000 0PARKWAY IN BURNSVILLE - LANDSCAPING1830 I 35W 2781-439 MN/DOT PORTLAND AVE & PARK AVE BRIDGES OVER I35W IN 0.3 BI BRIDGE REPAIR IM 4,7<strong>15</strong>,000 4,086,000 00 454,000 175,000MPLS-REDECK BRIDGES 27851 & 27852 & APPROACHOTHERWORK1831 I 35W 2782-293 MNDOT FROM PENN AVE TO PORTLAND AVE IN RICHFIELD/MPLS - 2.3 RB LANDSCAPING SF 250,000 0 00 250,000 0LANDSCAPE RESIDENTIAL SIDE OF NOISE WALLS INCOMMONS1832 I 35W 2782-319 MNDOT FROM PENN AVE TO PORTLAND AVE IN RICHFIELD/MPLS - 2.3 RB LANDSCAPING SF 250,000 0 00 250,000 0LANDSCAPE RESIDENTIAL SIDE OF NOISE WALLS INCOMMONS1833 I 35W 2782-321 MN/DOT W 90TH STREET, W 86TH STREET, W 82ND STREET ALL 0.3 BI BRIDGE REPAIR SF LF 1,5<strong>15</strong>,000 0 00 1,195,000 320,000OVER I35W IN BLOOMINGTON-DECK REPAIR OF BRIDGESOTHER9041, 9039, 9213, REPLACE SIGNAL, GUARDRAILSeptember 2011Project Listing Page III - 138 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!