12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 1Fiscal Year: 2014<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other108 BB TRF-0005-14 MNDOT SECT 5311: AEOA TRANSIT OPERATING ASSISTANCE 0.0 OB OPERATE BUS FTA 5,369,082 0 0 1,882,000 0 3,487,082109 BB TRF-0005-14-JA MNDOT SECT 5316: ARROWHEAD ECONOMIC OPPORTUNITY0.0 JA OPERATE BUS FTA 240,000 0 0 120,000 0 120,000AGENCY INC.,- RURAL RIDES OPERATING110 BB TRF-0005-14-JB MNDOT SECT 5316: ARROWHEAD ECONOMIC OPPORTUNITY0.0 JA OPERATE BUS FTA 225,000 0 0 180,000 0 45,000AGENCY INC.,- RURAL RIDES-MOBILITY MANAGEMENT111 BB TRF-0016-14A DULUTH TRANSIT SECT 5307: DULUTH DIAL-A-RIDE TRANSIT OPERATING 0.0 B9 OPERATE BUS LF 609,258 0 00 0 609,258AUTHORITY ASSISTANCE112 BB TRF-0016-14B DULUTH TRANSIT SECT 5307: DULUTH TRANSIT OPERATING ASSISTANCE 0.0 B9 OPERATE BUS FTA 10,803,442 0 0 1,300,000 0 9,503,442AUTHORITY REGULAR ROUTE & PREVENTATIVE MAINTENANCE113 BB TRF-0016-14C DULUTH TRANSIT SECT 5307: DULUTH TRANSIT CAPITAL0.0 B9 BUS GRANT FTA 699,856 0 0 559,885 0 139,971AUTHORITYCAPITALIMPROVEMENT114 BB TRF-0016-14-JA DULUTH TRANSIT SECT 5316: JARC URBAN OPERATING FUNDS FOR0.0 JA OPERATE BUS FTA 383,000 0 0 191,500 0 191,500AUTHORITY DULUTH TRANSIT AUTHORITY1<strong>15</strong> BB TRF-0022-14 MNDOT SECT 5311: HIBBING TRANSIT OPERATING ASSISTANCE 0.0 OB OPERATE BUS FTA 271,990 0 0 74,200 0 197,790116 BB TRS-0005-14 MNDOT ARROWHEAD TRANSIT-PURCHASE 9 BUSES - (CLASS 500) 0.0 TR PURCHASE BUS STP 1,125,000 900,000 00 0 225,000117 BB TRS-0016-14 DULUTH TRANSIT DTA-PURCHASE 10 BUSES TOTAL, 5 WILL BE HYBRID 0.0 TR PURCHASE BUS STP 5,616,000 3,440,000 00 0 2,176,000AUTHORITY (CLASS 700)118 RR 31-00125AC GRAND RAPIDS CLOSE ONE CROSSING & INSTALL GATES AT 19TH AVE 0.0 SR SAFETY TARGET RRS 877,500 877,500 00 0 0NW IN GRAND RAPIDS (PHASE 2)(AC PAYBACK 1 OF 1)119 CSAH 9 009-609-004 CARLTON COUNTY REHABILITATE APPROXIMATELY 3.1 MILES OF CSAH 9 3.1 RS BITUMINOUS STP 1,250,000 1,000,000 00 0 250,000LOCATED 2 MILES WEST OF THE CLOQUET CITY LIMITSPAVEMENT120 CSAH 14 031-614-014 ITASCA COUNTY FROM THE JCT OF ITASCA CSAH 29 TO JCT TH 38,<strong>15</strong>.5 RD BITUMINOUS STP 3,000,000 1,800,000 00 0 1,200,000PAVEMENT RECLAMATIONPAVEMENT121 PED/BIKE 036-090-002 KOOCHICHING SECOND CREEK TO RANIER, WIDEN TRAIL TO MEET1.5 EN PED./BIKETEA 51,930 0 207,7200 0 51,930COUNTY STANDARDS (AC PROJECT, PAYBACK IN 20<strong>15</strong>)IMPROVEMENT122 EN 038-090-007 BEAVER BAY BEAVER BAY TRAILHEAD FACILITY0.0 EN BUILDINGSTEA 500,000 400,000 00 0 100,000123 CSAH 4 038-604-017 LAKE COUNTY JCT LAKE CSAH <strong>15</strong> TO LAKE CSAH 5, BITUMINOUS1.8 RS BITUMINOUS STP 250,000 200,000 00 0 50,000SURFACINGPAVEMENT124 CSAH 5 038-605-013 LAKE COUNTY JCT LAKE CSAH 4 TO JCT TH 61, PAVEMENT1.8 RD BITUMINOUS STP 1,000,000 800,000 00 0 200,000RECLAMATION, MILL & OVERLAYRECLAMATIONSeptember 2011Project Listing Page III - 12 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!