12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Highway Safety Improvement ProjectsFiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq # ATPRouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1842 M US 52 1905-33 MNDOT AT DAKOTA CSAH 86 IN RANDOLPH TWP-CONVERTTO A 3/4 INTERSECTION WITH MEDIAN U-TURNS,EXTEND TURN LANES AT INTERSECTION,DRAINAGE & LIGHTING1.4 SH GRADE ANDSURFACEHSIP 905,300 814,770 00 90,530 01843 M US 52 1906-57 MNDOT AT DAKOTA CSAH 66 IN VERMILLION TWP-CONSTRUCT 3/4 INTERSECTION WITH MEDIAN UTURNS, EXTEND TURN LANES AT INTERSECTION,DRAINAGE & LIGHTING1.2 SH GRADE,SURFACE& BRIDGEHSIP 910,300 819,270 00 91,030 02206 C TH 999 880C-HSP-13 MNDOT STRATEGIC HIGHWAY SAFETY PLAN - LOW COST 0.0 SH MEDIAN BARRIER HSIP 550,000 495,000 00 55,000 0SAFETY IMPROVEMENTS2220 C TH 999 880C-TZD-13 MNDOT TOWARDS ZERO DEATH BEHAVORIAL STRATEGIES 0.0 SH TZD BEHAVIOR HSIP 1,180,000 1,062,000 00 0 118,000EDUCATION, ENFORCEMNT, EVALUATION,STRATEGIESPROGRAM SUPPORT)$20,480,552 $18,524,916 $0$0 $682,587 $1,273,049September 2011HSIP Project Listing A-3 Page 9 of 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!