12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 3Fiscal Year: 2014<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other566 CSAH 4 033-604-018 KANABEC COUNTY KANABEC CSAH 10 TO TH 47, MILL & OVERLAY2.0 RS MILL ANDSTP 385,700 308,500 00 0 77,200OVERLAY567 CSAH 12 033-612-013 KANABEC COUNTY FROM TH 23 TO KANABEC CSAH 6, MILL & OVERLAY (AC 4.7 RS MILL ANDSTP 672,200 493,600 220,8000 0 178,600PROJECT, AC PAYBACK IN 20<strong>15</strong>)OVERLAY568 CSAH 4 048-604-017 MILLE LACS MILLE LACS CSAH 13 TO MILLE LACS CSAH 12,4.2 RC GRADE AND STP 1,369,500 4<strong>15</strong>,700 00 0 953,800COUNTY RECONSTRUCT INCLUDING WIDENINGSURFACE569 CSAH 20 049-620-005 MORRISON FROM TH 10 TO MORRISON CSAH 3, MILL & OVERLAY 4.2 RS MILL ANDSTP 630,686 391,286 00 0 239,400COUNTYOVERLAY570 CSAH <strong>15</strong> 071-6<strong>15</strong>-010 SHERBURNE TH 10 TO NORTH INTERSECTION OF SHERBURNE CR 79, 2.5 RC GRADE AND STP 2,250,000 1,607,500 00 0 642,500COUNTY GRADE, BASE & BITUMINOUS, INCL. REALIGNMENT OFSURFACESHERBURNE CR 79 INTERSECTION571 EN 077-595-001 TODD COUNTY RESTORATION OF THE EXISTING DEPOT STRUCTURE IN 0.0 EN HISTORICTEA 505,<strong>15</strong>0 404,120 00 0 101,030STAPLESPRESERVATION572 PED/BIKE 086-090-004 HANOVER CONSTRUCT BIKE/PED TRAIL ALONG WRIGHT CSAH 34 3.8 EN PED./BIKETEA 973,557 657,500 00 0 316,057FROM BEEBE LAKE REGIONAL PARK IN ST. MICHAEL TOIMPROVEMENTINTERSECTION OF CSAH 19 & 34 IN HANOVER573 CSAH 33 086-633-002 WRIGHT COUNTY TH 55 TO WRIGHT CSAH 44, RECLAIM & RESURFACE,INCL. INSTALLING SAFETY EDGE ALONG SHOULDER,CONSTRUCTING RIGHT-TURN & BYPASS LANES,UPDATING SIGNING & INSTALLING STREET LIGHTING ATVARIOUS RURAL INTERSECTIONS4.7 RD BITUMINOUSRECLAMATIONSTP 900,000 720,000 00 0 180,000574 LOCAL 999 162-<strong>15</strong>1-001 ST. CLOUD 33RD STREET SOUTH PHASE 1: CSAH 75 TO SOUTHWAY 0.5 MC GRADE AND STP 3,500,000 1,900,000 00 0 1,600,000DRIVE, EXPAND TO 4-LANE, INCL ROUNDABOUT ATSURFACESOUTHWAY DR.575 LOCAL 999 220-117-002AC1 SARTELL GRADING, AGG BASE, BITUMINOUS SURFACING,CONCRETE CURB & GUTTER, ROUNDABOUTS, STORMSEWER & WATER MAIN FOR 50TH AVENUE FROM JCT. CR120 & 50TH AVE TO 0.429 MI. N OF 50TH AVE (ACPAYBACK, 1 OF 2)0.4 MC GRADE ANDSURFACESTP 172,000 172,000 00 0 0576 LOCAL 999 233-020-003 SAINT JOSEPH **MN162**WESTWOOD PARKWAY EXTENSION RIGHT-OF- 0.0 MC GRADE &HPP 220,000 176,000 00 0 44,000WAY ACQUISITION BETWEEN WESTWOOD PARKWAY ANDSURFACESTEARNS CSAH 133 IN SAINT JOSEPH577 US 10 0502-103 MNDOT BENTON CO. CSAH 4 TO 0.2 MI. W. OF RAILROAD5.7 RC UNBONDED NHS 4,900,000 2,5<strong>15</strong>,000 7,025,0000 2,385,000 0CROSSING IN ST. CLOUD, UNBONDED CONCRETECONCRETEOVERLAY (AC PROJECT, PAYBACK IN 20<strong>15</strong>)OVERLAY578 MN <strong>15</strong> 7303-48 SAINT CLOUD **TED** CONSTRUCT NEW INTERCHANGE AT TH <strong>15</strong> AND 0.5 AM GRADE AND SB 12,400,000 0 00 0 12,400,00033RD STREET IN SAINT CLOUD AND WAITE PARKBRIDGESeptember 2011Project Listing Page III - 46 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!