12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Highway Safety Improvement ProjectsFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq # ATPRouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other425 3 LOCAL 999 080-070-002 WADENA COUNTY INSTALL LIGHTING, SIGNING AND PAVEMENT 0.0 SH MISCELLANEOUS HSIP 86,200 77,580 00 0 8,620MARKINGS AT VARIOUS LOCATIONS IN WADENACOUNTY427 3 LOCAL 999 086-070-006 WRIGHT COUNTY WRIGHT COUNTY, INSTALL CHEVRONS AT77.9 SH SIGNINGHSIP 264,000 225,000 00 0 39,000VARIOUS LOCATIONS457 3 US 169 7106-74S MNDOT JCT. TH 10 IN ELK RIVER TO 0.18 MI. S. OF 225TH 5.7 SH TURN LANES HSIP 250,000 225,000 00 25,000 0AVE., MILL & OVERLAY, PAVE SHOULDERS,EXTEND TURN LANES (HSIP PROJECT)464 3 MN 999 8823-145 MNDOT DISTRICTWIDE INTERSECTION LIGHTING AT0.0 SH LIGHTINGHSIP 466,667 420,000 00 46,667 0VARIOUS TRUNK HIGHWAY/TRUNK HIGHWAYINTERSECTIONS (HSIP PROJECT)465 3 MN 999 8823-148 MNDOT DISTRICTWIDE0.0 SH RUMBLE STRIPS HSIP 237,777 213,999 00 23,778 0RUMBLESTRIPS/SIGNING/MARKINGS PROJECT(HSIP PROJECT)466 3 MN 999 8823-250 MNDOT DISTRICTWIDE SIGNAL COORDINATION PROJECT 0.0 SH TRAFFIC SIGNAL HSIP 290,000 261,000 00 29,000 0(HSIP PROJECT)REVISION469 3 LOCAL 999 8803-SHL-12 MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY 0.0 SH SAFETY TARGET HSIP 28,664 25,798 00 0 2,866IMPROVEMENT PROGRAM - <strong>2012</strong>708 4 MN 999 8824-84 MNDOT DISTRICTWIDE SAFETY RUMBLE STRIPING0.0 SH MISCELLANEOUS HSIP 539,200 485,300 00 53,900 0PROJECT (STATE HSIP) - <strong>2012</strong>713 4 LOCAL 999 8804-SHL-12 LOCAL DISTRICTWIDE SETASIDES - SAFETY (LOCAL 0.0 SH STRIPINGHSIP 666,000 600,000 00 0 66,000HSIP) - <strong>2012</strong>862 6 LOCAL 999 024-070-009 FREEBORN COUNTY EDGELINE RUMBLE STRIPES - VARIOUS0.0 SH SAFETY TARGET HSIP 70,350 63,3<strong>15</strong> 00 0 7,035LOCATIONS IN FREEBORN COUNTY863 6 LOCAL 999 024-070-010 FREEBORN COUNTY INTERSECTION LIGHTING - VARIOUS LOCATIONS IN 0.0 SH SAFETY TARGET HSIP 126,000 113,400 00 0 12,600FREEBORN COUNTY868 6 LOCAL 999 055-070-019 OLMSTED COUNTY EPOXY 6 INCH EDGELINE - VARIOUS LOCATIONS IN 42.8 SH SAFETY TARGET HSIP 271,320 244,188 00 0 27,132OLMSTED COUNTY876 6 LOCAL 999 088-070-030 DISTRICTWIDE DISTRICT 6 CHEVRONS - VARIOUS LOCATIONS 0.0 SH SAFETY TARGET HSIP 552,933 497,640 00 0 55,293DISTRICTWIDE904 6 TH 63 5510-77 MN/DOT INTERSECTION IMPROVEMENTS AT 75TH ST. 0.0 SH GRADE AND HSIP 1,500,000 675,000 00 75,000 750,000(CSAH 14) AND T.H. 63 INTERSECTION -SURFACEROCHESTER917 6 LOCAL 999 8806-SHL-12 LOCAL HSIP/HRRR SETASIDE - LOCAL - <strong>2012</strong> 0.0 SH SAFETY TARGET HSIP 567,632 510,869 00 0 56,763918 6 MN 999 8806-SHS-12 MN/DOT HSIP/HRRR SETASIDE (PROACTIVE) - MN/DOT <strong>2012</strong> 0.0 SH SAFETY TARGET HSIP 727,778 655,000 00 72,778 011<strong>15</strong> 7 LOCAL 999 040-070-001 LE SUEUR COUNTY INTERSECTION LIGHTING ON VARIOUS CSAH & 0.0 SH LIGHTINGHSIP 67,000 60,300 00 0 6,700COUNTY ROADS COUNTY WIDESeptember 2011HSIP Project Listing A-3 Page 4 of 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!