12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1874 MN 610 2771-37E MN/DOT **MN266** TH 610 CONSTRUCTION-ROADWAY5.1 MC GRADE,SURFACE HPP 399,932 399,932 00 0 0IMPROVEMENTS (2010 APPROPRIATIONS ACT-STP)& BRIDGE1875 I 694 6285-146 MN/DOT AT RAMSEY COUNTY ROAD F IN ARDEN HILLS - NEW 0.0 SC TRAFFIC SIGNAL STP LF 200,000 106,720 00 26,680 66,600SIGNAL INSTALLATION (DE-BUNDLED FROM 6285-135)INST.1876 I 694 6285-147 MN/DOT FROM I35W IN ARDEN HILLS TO VICTORIA STREET2.7 SC MEDIAN BARRIER NHS 210,000 189,000 00 21,000 0(RAMSEY CSAH 52) IN SHOREVIEW - CABLE MEDIANGUARDRAIL (DE-BUNDLED FROM 6285-135)1877 I 694 6286-55 MNDOT FROM US 61 TO CENTURY AVE IN WHITE BEAR LAKE - 2.2 SC LIGHTINGSF 620,000 0 00 620,000 0REPLACEMENT OF INTERCHANGE LIGHTING1878 US 952 1908-82 MNDOT EAST BERNARD ST/DAKOTA MSAS 114, WEST ST PAUL - 0.0 SC TRAFFIC SIGNAL SF LF 250,000 0 00 125,000 125,000SIGNAL REPLACEMENTREVISION1879 MN 952A 2770-01 MN/DOT 3RD AVE RAMP IN MPLS FROM NW END OF BR 27816 N TO 1.1 RD SHOULDER SF 1,020,000 0 00 1,020,000 0JCT OF I94 & WB RAMP FROM WASHINGTON AVE - BUSREPLACEMENTSHOULDER REPLACEMENT1880 MN 999 8825-212 MN/DOT METROWIDE - RELAMP IN ONE QUADRANT0.0 SC LIGHTINGSF 450,000 0 00 450,000 01881 MN 999 8825-356 MNDOT METROWIDE ADA SIGNAL UPGRADES0.0 SC TRAFFIC SIGNAL SF 100,000 0 00 100,000 0REVISION1882 MN 999 8825-366 MN/DOT METROWIDE - REPLACE DMS, COMMUNICATIONS &0.0 TM TRAFFIC MGMT. SF 500,000 0 00 500,000 0CONTROLLERSSYSTEM1883 MN 999 TRLF-RW-13 MN/DOT REPAYMENT, FY 2013, TRLF LOANS USED FOR RIGHT OF 0.0 RW RIGHT OF WAY SF 2,244,000 0 00 2,244,000 0WAY PURCHASE ON THS 212 & 651884 MN 999 880M-ADA-13 MNDOT **ADA** METRO SETASIDE FOR ADA PROJECT FOR FY 0.0 SC CURB & GUTTER STP 1,080,000 860,000 00 220,000 020131885 MN 999 880M-RW-13 MN/DOT METRO SETASIDE FOR RIGHT OF WAY FOR FY 20130.0 RW RIGHT OF WAY SF 19,000,000 0 00 19,000,000 01886 MN 999 880M-SAS-13 MNDOT DISTRICTWIDE SETASIDES - 20130.0 NA MISCELLANEOUS NHS 61,180,000 8,456,000 00 52,724,000 0$806,842,324 $243,470,397 $0 $220,011,336 $123,917,284 $219,443,307September 2011Project Listing Page III - 142 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!