12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 7Fiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1192 MN 4 8827-144 MNDOT **ELLA** FROM 4.5 MI NORTH OF TH 30 TO 8.4 MI NORTH 3.9 RS BITUMINOUS SF 600,000 0 00 600,000 0OF TH 30, OVERLAYOVERLAY1193 MN 5 7201-44 MNDOT FROM 1ST STREET IN GAYLORD TO WEST CHANDLER 7.9 RS MILL ANDSTP 2,840,000 2,272,000 00 568,000 0STREET IN ARLINGTON, MILL & OVERLAYOVERLAY1194 MN 13 8102-25 MNDOT FROM 4TH ST NW TO 375TH AVE IN WASECA, MILL &1.7 RS MILL ANDSTP 1,060,000 848,000 00 212,000 0OVERLAYOVERLAY1195 US 14 0702-116AC1 MNDOT **LGA** CSAH 12 & TH 14 BRIDGE #07587 & RAMPS (LGA 0.0 BR NEW BRIDGE NHS 1,000,000 1,000,000 00 0 0PAYBACK TO COUNTY 1 OF 5) TIED 007-612-0111196 MN 22 0704-88 MNDOT JCT OF TH 22 AND MADISON AVE IN MANKATO,0.0 MC GRADE AND STP 2,200,000 1,760,000 00 440,000 0CONSTRUCT ROUNDABOUTSURFACE1197 MN 22 5205-31 MNDOT 4.4 MI NW OF TH 169 AT ST PETER, REHAB BR 40140.0 BI BRIDGE REPAIR STP 736,000 588,800 00 147,200 01198 MN 30 0705-21 MNDOT **ELLA** FROM TH <strong>15</strong> TO 3 MI E & TH 169 TO 1.4 MI W, MILL 4.3 RS MILL ANDSTP 1,830,000 1,464,000 00 366,000 0& OVERLAY (ASSOC. 8306-11)OVERLAY1199 MN 30 8307-09 MNDOT FROM DARFUR TO TH 4, MILL & OVERLAY9.9 RS MILL ANDSTP 2,970,000 2,376,000 00 594,000 0OVERLAY1200 MN 60 5305-65 MNDOT <strong>FINAL</strong> LANDSCAPING FOR 5305-58 & 5305-591.0 RB LANDSCAPING BF 400,000 0 00 0 400,0001201 MN 60 8308-44 MNDOT FROM 3.554 MI E OF THE WATONWAN COUNTY LINE TO 5.2 MC GRADE AND NHS 3,760,000 0 <strong>15</strong>,040,0000 3,760,000 0WEST OF ST JAMES (AC PROJECT, PAYBACK IN 2014 &SURFACE20<strong>15</strong>)1202 MN 68 0710-30 MNDOT 0.1 MI W OF JCT TH 169 AT MANKATO, REPLACE BRIDGE 0.0 BR BRIDGEBROS 911,000 729,000 00 182,000 05513REPLACEMENT1203 US 75 5905-23 MNDOT 0.9 MI SOUTH OF TROSKY, REPLACE BRIDGE 83630.0 BR BRIDGESTP 334,000 267,000 00 67,000 0REPLACEMENT1204 US 75 5905-24 MNDOT 2.5 MI SOUTH OF TROSKY, REPLACE BRIDGE 63<strong>15</strong>0.0 BR BRIDGESTP 907,000 726,000 00 181,000 0REPLACEMENT1205 US 75 6704-19 MNDOT 0.6 MI NORTH OF I 90 IN LUVERNE, REPLACE BR 6245 0.0 BR BRIDGESTP 530,000 424,000 00 106,000 0REPLACEMENT1206 MN 86 3207-09 MNDOT FROM THE IOWA BORDER TO I90, MILL & OVERLAY9.7 RS MILL ANDSTP 2,610,000 2,088,000 00 522,000 0OVERLAY1207 MN 91 5307-28 MNDOT **ELLA** FROM RP 1.8 TO 2.6 & RP 7.2 TO 9.<strong>15</strong>,2.8 RS BITUMINOUS SF 300,000 0 00 300,000 0BITUMINOUS OVERLAY (BARC)OVERLAYSeptember 2011Project Listing Page III - 92 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!