12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 4Fiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other828 MN 12 3403-66M MNDOT KERKHOVEN TO PENNOCK - BITUMINOUS OVERLAY7.6 RS BITUMINOUS SF 1,637,300 0 00 1,637,300 0(D8/D4 PROJECT)OVERLAY829 MN 29 7607-29 MNDOT BENSON TO JCT OF MN 40 - MILL & BITUMINOUS OVERLAY 14.0 RS BRIDGESF 3,545,400 0 00 3,545,400 0& REPLACE BRIDGE #6550, 6551, 6552REPLACEMENT830 MN 34 1404-17 MNDOT I-94 TO DUNVILLA - MILL & BITUMINOUS OVERLAY17.4 RS MILL ANDSTP SF 8,139,900 6,511,900 00 1,628,000 0(ALTERNATE BID)OVERLAY831 MN 999 8804-ADA-<strong>15</strong> MNDOT **ADA** DISTRICTWIDE "ADA" FUND - FY 20<strong>15</strong>0.0 SC PEDESTRIAN STP 162,500 130,000 00 32,500 0RAMPS832 MN 999 8804-RW-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - RIGHT-OF-WAY - 20<strong>15</strong>0.0 RW RIGHT OF WAY SF 1,500,000 0 00 1,500,000 0833 MN 999 8804-SAS-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - 20<strong>15</strong>0.0 NA MISCELLANEOUS SF 6,225,400 0 00 6,225,400 0834 LOCAL 999 8804-SHL-<strong>15</strong> LOCAL DISTRICTWIDE SETASIDES - SAFETY (LOCAL HSIP) - 20<strong>15</strong> 0.0 SH STRIPINGHSIP 666,000 600,000 00 0 66,000835 MN 999 8804-SHS-<strong>15</strong> MNDOT DISTRICTWIDE SAFETY IMPROVEMENTS (STATE HSIP) - 0.0 SH MISCELLANEOUS HSIP 539,200 485,300 00 53,900 020<strong>15</strong>$58,841,126 $28,961,093 $2,000,000 $5,372,020 $18,791,700 $5,716,313September 2011Project Listing Page III - 66 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!