12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 1Fiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other88 MSAS 148 118-148-040 DULUTH 10TH AVE E BETWEEN, E 2ND STREET & E 9TH ST,0.5 RC GRADE AND STP 3,242,500 950,000 00 0 2,292,500RECONSTRUCTSURFACE89 MN 1 3101-34 MNDOT **ELLA** EFFIE URBAN RECONSTRUCTION PROJECT, 0.4 RC BITUMINOUS STP 1,565,000 960,000 00 605,000 0PAVEMENT, DRAINAGE, CURB, GUTTER, SIDEWALKPAVEMENT90 MN 1 3803-33 MNDOT **FMB**AT MURPHY CITY, RAISE GRADE TO PREVENT 0.0 RC GRADE AND BF 450,000 0 00 0 450,000FLOODINGSURFACE91 MN 1 6904-46 MNDOT **MN202** 0.3 MI W SIX MI LAKE RD TO DEER HAVEN RD 4.8 RC GRADE AND HPP 18,500,000 14,800,000 00 3,700,000 0(EAGLES NEST AREA), RECONSTRUCTION & PASSINGSURFACELANE (ALTERNATE BID)92 MN 11 3604-72M MNDOT **ELLA** 1 MI W INDUS TO LOMAN, BITUMINOUS MILL & 8.7 RS MILL ANDCBI STP 5,227,000 4,182,000 00 1,045,000 0OVERLAY, SHOULDER WIDENING, DRAINAGE REPAIRSOVERLAY(INCLUDE OTHER DISTRICT SP), DISTRICT 2 SP 3604-7293 MN 23 6910-82 MNDOT 0.1 & 1.1 MI S JCT I-35, REPLACE BR #S 88544 & 88545 0.0 BR BRIDGEBR 1,200,000 960,000 00 240,000 0REPLACEMENT94 MN 33 6911-38 MNDOT 0.2 MI N MORRIS THOMAS RD TO JCT TH 53, BITUMINOUS 12.8 RS MILL ANDNHS 6,300,000 5,040,000 00 1,260,000 0MILL & OVERLAYOVERLAY95 I 35 0980-09807 MNDOT 1 MI N JCT TH 27 TO ST LOUIS RIVER, SCANLON, PAINT BR 0.0 BI BRIDGE REPAIR IM 3,900,000 3,510,000 00 390,000 0#S 09807, 09808, 09837, 09838, DECK OVERLAY BR #S09819, 0983296 MN 61 8821-<strong>15</strong>3 MNDOT **ELLA** 0.4 MI S GOOSEBERRY STATE PARK TO LAKE CO <strong>15</strong>.6 RS BITUMINOUS NHS 3,500,000 2,000,000 00 1,500,000 0CSAH 5 (PORTIONS), BITUMINOUS OVERLAYOVERLAY97 MN 65 3609-34 MNDOT 11.1 MI N S KOOCHICHING CO LINE TO 4.8 MI S JCT TH 71, 0.0 BR BRIDGESTP 2,600,000 2,080,000 00 520,000 0REPLACE BR #s 4677, 6766, 6767, 91272REPLACEMENT98 MN 73 6927-19 MNDOT 9.4 MI S JCT TH 2 TO JCT TH 2, BITUMINOUS MILL & INLAY 9.4 RS MILL ANDSTP 1,800,000 1,440,000 00 360,000 0OVERLAY99 MN 123 5802-5718A MNDOT SANDSTONE, REHABILITATE BR 57180.0 BI BRIDGE REPAIR SF 1,982,000 0 00 1,982,000 0100 US 169 6934-1<strong>15</strong> MNDOT 2.8 MI N NASHWAUK TO W JCT TH 73, BITUMINOUS6.6 RS BITUMINOUS NHS 5,394,000 4,3<strong>15</strong>,200 00 1,078,800 0OVERLAYOVERLAY101 MN 169 6936-17 MNDOT **ELLA** **MN202** JCT ST LOUIS CO RD 567 TO 0.25 MI S 1.6 RC GRADE AND HPP 4,500,000 3,600,000 00 900,000 0OF W JCT TH 1 (13 HILLS AREA) RECONSTRUCTSURFACE102 MN 999 8801-ADA-13 MNDOT **ADA** DISTRICTWIDE SETASIDES - ACCESSIBILITY 0.0 EN PED./BIKETEA 262,500 210,000 00 52,500 0IMPROVEMENTS-2013IMPROVEMENT103 MN 999 8801-BR4M-13 MNDOT BETTER ROADS BACKFILL FOR SP 0121-280.0 RS MILL ANDNHS STP 7,600,000 6,080,000 00 1,520,000 0OVERLAYSeptember 2011Project Listing Page III - 10 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!