12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: 2014<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1966 MN 7 2706-227 MNDOT AT 5TH AVE N/OAKRIDGE RD IN HOPKINS - TRAFFIC0.0 SC TRAFFIC SIGNAL SF LF 250,000 0 00 125,000 125,000SIGNAL REBUILDREVISION1967 US 8 1301-109 MNDOT FROM WEST OF SHOQUIST LANE IN CHISAGO CITY TO 2.7 RC LANDSCAPING SF 100,000 0 00 100,000 0EAST OF IRENE AVE IN LINDSTROM - LANDSCAPING1968 US 10 6205-37 MN/DOT I35W TO I694, ARDEN HILLS & MOUNDS VIEW - MILL & 2.0 RS MILL ANDNHS 3,034,000 2,427,200 00 606,800 0OVERLAY, DRAINAGEOVERLAY1969 MN 25 7003-13 MN/DOT MN25/TH169 WEST RAMP TERMINAL AS IT INTERSECTS IN 0.1 SC TRAFFIC SIGNAL SF 250,000 0 00 250,000 0BELLE PLAINE - INSTALL SIGNAL SYSTEMS ANDINST.NECESSARY EQUIPMENT1970 I 35E 6280-308RW4 MN/DOT **MN209** I-94 TO MARYLAND AVE, ST PAUL - RW &1.8 RW RIGHT OF WAY HPP 912,909 730,327 00 182,582 0RECONSTRUCTION (SAFETEA-LU)1971 I 35E 6281-19 MN/DOT FROM RAMSEY CR E TO 0.2 MILES S OF RAMSEY CSAH 96IN VADNAIS HTS-BITUMINOUS MILL & OVERLAY,REPAIR/REPLACE CULVERTS, PIPES & DRAINAGE, LOOPDETECTORS1.5 RS MILL ANDOVERLAYSF 1,950,000 0 00 1,950,000 01972 I 35E 6281-20 MN/DOT RAMSEY CSAH 96 OVER I35E IN WHITE BEAR LAKE-0.0 BI REDECKIM 1,440,000 1,296,000 00 144,000 0REDECK BRIDGE 62834, REPLACE APPROACH PANELS,DRAINAGE1973 I 35W 0280-68 MNDOT INTERCHANGES AT S JCT ANOKA CSAH 23 (LAKE DR) INBLAINE, AT ANOKA CSAH 32 (85TH AVE) INBLAINE/SHOREVIEW AND AT N JCT ANOKA CSAH 23 (LAKEDR) IN LINO LAKES - REPLACE INTERCHANGE LIGHTING6.2 SC TRAFFIC SIGNALREVISIONSF 235,000 0 00 235,000 01974 I 35W 2782-295 MNDOT FROM 42ND ST IN MPLS TO 66TH ST IN RICHFIELD -4.0 RB LANDSCAPING SF 500,000 0 00 500,000 0GATEWAYS LANDSCAPING1975 I 35W 2782-320 MN/DOT FROM W 94TH ST OVER I35W IN BLOOMINGTON -1.5 BR BRIDGEIM 8,525,000 7,452,000 00 828,000 245,000REPLACE BRIDGE 9053, APPROACH WORK, DRAINAGE,REPLACEMENTSIDEWALKS, GUARDRAILS, RETAINING WALLS, TMS1976 I 35W 2783-128 MN/DOT NB, UNDER HENN AVE TO STINSON BLVD EXIT RAMP, 0.3 RS MILL ANDIM 720,000 648,000 00 72,000 0MPLS - INSTALL DRAINAGE SYSTEM, NB SHOULDER/DITCHOVERLAY1977 I 35W 6284-<strong>15</strong>7 MN/DOT AT RAMSEY CSAH 96 (CTY RD G) OVER I35W IN ARDEN 0.1 BI REDECKIM 1,060,000 954,000 00 106,000 0HILLS - REDECK BRIDGE 9577, APPROACH PANEL WORK,GUARDRAIL1978 MN 36 8204-62 MNDOT FROM I-694 IN PINE SPRINGS TO JUST EAST OF1.2 MC LANDSCAPING SF 50,000 0 00 50,000 0HIGHLANDS TRAIL N. IN GRANT - LANDSCAPINGSeptember 2011Project Listing Page III - 149 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!