12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project # Grantee Project Title Project Summary Type of Use Total CostLake Maria State ParkDNR Parks andto expand the existing equestrian parking area at Lake Non-D102-11-3AEquestrian Parking AreaTrailsMaria State ParkMotorizedImprovementsD103-11-3CD104-11-2CD105-11-4DD106-11-1AD107-11-2AD108-11-4DD109-11-1AD110-11-3AD111-11-1BD112-11-2AD113-11-2BDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsDNR Parks andTrailsZumbro Bottoms Horse CampWell ImprovementsParks and Trails SnowmobileTrail Groomers and DragsSakatah State Trail ResurfacingHeartland State Trail - Red Bridge RapidsAlborn/Pengilly GradeMill Towns State TrailItasca State Park Pedestrian/BikeTrail RehabilitationGlacial Lakes State Trail -Richmond to 178th AvenueGlendalough State Park TrailRehabilitation of Blue Ox Trail -Big Falls BridgeBear Head Lake State Park TrailCenterto provide improvements to the well/water supplysystem at the West and Central horse camp areas at Non-Zumbro Bottoms within the Richard J. Dorer Memorial MotorizedHardwood State ForestAmountFunded$40,000 $20,000$30,000 $<strong>15</strong>,000to purchase snowmobile trail grooming equipment Motorized $300,000 $<strong>15</strong>0,000to resurface and widen approximately <strong>15</strong> miles of 8foot wide bituminous Sakatah State Trail from the Cityof Faribault to Sakatah Lake State Parkto realign the Heartland State Trail and to replace theRed Bridge over the Fishhook River in the City of Parkto rehabilitate 2 bridges crossing the Whiteface and St.Louis Rivers on the Pengilly to Alborn RecreationalTrailto resurface and widen from 8 feet to 10 feet 3 miles ofthe existing Mill Towns State Trail between Northfieldand Dundasto rehabilitate the existing State Park RecreationalTrail within Itasca State Park from Douglas Doudge tothe Headwaters of the Mississippito develop 2.4 miles of the Glacial Lakes State Trailthrough the City of Richmond in Stearns Countyto design and develop 3 miles of new paved trail withinGlendalough State Park connecting to the town ofBattle Laketo rehabilitate/re-deck a former railroad trestle bridgeon the Blue Ox Trail over the Bigfork River at BigFalls, MNto construct a new year-round trail center within BearHead Lake State ParkJoint $450,000 $<strong>15</strong>0,000Joint $500,000 $171,864Motorized $400,000 $100,000Joint $300,000 $<strong>15</strong>0,000Non-Motorized$500,000 $173,049Joint $450,000 $<strong>15</strong>0,000Non-Motorized$500,000 $<strong>15</strong>0,000Motorized $325,000 $<strong>15</strong>0,000Joint $300,000 $<strong>15</strong>0,000Non-Motorized $938,291Motorized $1,057,309Joint $1,445,797TOTAL $11,009,292 $3,441,397A-6(4)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!