12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 8Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1332 US 59 5105-21 MNDOT N OF S JCT MN 30 TO N OF N JCT MN 30, MILL & OVERLAY 5.9 RD MILL ANDSTP 4,841,411 3,873,129 00 968,282 0PLUS FIX "S" CURVE (ALTERNATE BID)OVERLAY1333 MN 68 4106-21 MNDOT PORTER TO MINNEOTA, OVERLAY10.2 RS BITUMINOUS STP 1,075,284 860,227 00 2<strong>15</strong>,057 0OVERLAY1334 MN 68 4210-40 MNDOT W LIMITS OF MINNEOTA TO JCT US 59 IN MARSHALL, MILL 12.2 RS MILL ANDSF 3,003,210 0 00 3,003,210 0& OVERLAY PLUS AN UTBWC (A PORTION OF THISOVERLAYPROJECT $S IS FROM BACKFILLING BONDING PROJECT)1335 MN 68 6408-10 MNDOT N. JCT US 71 TO JCT MN 67, OVERLAY9.9 RS BITUMINOUS STP 1,002,456 801,965 00 200,491 0OVERLAY1336 US 71 6508-65 MNDOT IN OLIVIA - UTILITY WORK - <strong>2012</strong> COOPERATIVE0.2 AM COOP. CONST. SF 225,000 0 00 225,000 0AGREEMENTAGREEMENT1337 US 75 4107-18 MNDOT PIPESTONE CREEK TO LAKE BENTON, OVERLAY12.8 RS BITUMINOUS SF 1,379,040 0 00 1,379,040 0PAVEMENT1338 US 212 1212-30 MNDOT FROM 3.<strong>15</strong> MILES W. OF W. JCT US 59 TO E. JCT. US 59, 6.8 RS CONCRETE NHS BF 5,800,000 4,640,000 00 0 1,160,000WHITETOPPING OR FULL DEPTH RECLAIMATIONOVERLAY(ALTERNATE BID)1339 US 212 3706-39 MNDOT W. OF US 75 TO FIRST STREET IN DAWSON, MILL &CONCRETE OVERLAY (FULL DEPTH) AND ON TH 75 FROM0.4 MILES S. OF US 212 TO 1.0 MILES N. OF US 212, MILL &OVERLAY (ALTERNATE BID)8.9 RD MILL ANDOVERLAYNHS 6,210,780 4,968,624 00 1,242,<strong>15</strong>6 01340 US 212 6510-65 MNDOT JCT OF US 212 & US 71, MODIFY TURN LANE0.1 SH TURN LANES HSIP 100,000 90,000 00 10,000 01341 MN 999 8828-121 MNDOT EDGELINE/CENTERLINE RUMBLE STRIPES DISTRICTWIDE 0.0 SH STRIPINGHSIP 200,000 180,000 00 20,000 01342 MN 999 8828-129 MNDOT RED LIGHT CONFIRMATION LIGHTS (<strong>15</strong> INTERSECTIONS) 0.0 SH WARNINGHSIP 190,000 171,000 00 19,000 0AND EVP (10 LOCATIONS)FLASHERS1343 MN 999 8828-130 MNDOT HIRE CONTRACTOR TO INSTALL SIGNS FOR DISTRICT 8'S 0.0 RX SIGNINGSF 243,320 0 00 243,320 0ANNUAL SIGN CHANGEOVER1344 MN 999 8808-RW-12 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - <strong>2012</strong>0.0 RW RIGHT OF WAY SF 650,000 0 00 650,000 01345 MN 999 8808-SAS-12 MNDOT DISTRICTWIDE SETASIDES - <strong>2012</strong>0.0 NA MISCELLANEOUS SF 6,100,521 0 00 6,100,521 01346 LOCAL 999 8808-SHL-12 MNDOT DISTRICTWIDE LOCAL SETASIDES - HSIP - <strong>2012</strong>0.0 SH SAFETY TARGET HSIP 733,333 660,000 00 0 73,333$56,038,508 $28,802,125 $0 $1,579,655 $17,273,268 $8,383,460September 2011Project Listing Page III - 102 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!