12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other<strong>15</strong>38 CR 002-596-009 ANOKA COUNTY **MN130**PRELIMINARY ENGINEERING FOR MISSISSIPPI 0.0 PL PLANNINGHPP 1,687,000 719,921 00 0 967,079RIVER BRIDGE CONNECTING I-94 & TH 10 BETWEEN TH169 & TH 101 (SAFETEA-LU)<strong>15</strong>39 CSAH 7 002-607-019 ANOKA COUNTY ANOKA CSAH 7(7TH AVE) & ANOKA CSAH 14(MAIN ST), 0.0 SH SPOTHSIP 1,680,000 1,512,000 00 0 168,000ANOKA-REPLACE TRAFFIC SIGNAL, TURN LANESIMPROVEMENT<strong>15</strong>40 CSAH 17 002-617-018 ANOKA COUNTY ANOKA CSAH 14 (MAIN ST), BLAINE TO 1,000 FT N OFANOKA CSAH 116(BUNKER LAKE BLVD), HAM LAKE-RECONSTRUCT TO 6-LANE DIVIDED RDWY, BLAINE & A 4-LANE DIVIDED RDWY, HAM LAKE INCLUDING PED/BIKEFACILITIES2.2 RC GRADE ANDSURFACEUG 12,000,000 5,837,920 00 0 6,162,080<strong>15</strong>41 CSAH 116 002-716-012 ANOKA COUNTY ANOKA CSAH 7 TO 38TH AVE, ANOKA & ANDOVER-1.0 RC GRADE AND UG 5,885,600 4,708,480 00 0 1,177,120RECONSTRUCT TO 4-LANE DIVIDED RDWY, PED/BIKESURFACETRAIL<strong>15</strong>42 PED/BIKE 010-090-002 CARVER COUNTY MAYER TO CARVER/MCLEOD CO LINE-CONSTRUCT6.0 EN PEDESTRIAN TEA 1,478,400 1,120,000 00 0 358,400CARVER CO DAKOTA RAIL LINE PED/BIKE TRAIL ONBIKE TRAILABANDONED DAKOTA RAIL LINE CORRIDOR<strong>15</strong>43 PED/BIKE 010-090-003 CARVER COUNTY W PARKING LOT, MINNEWASHTA REG PARK, TOMINNETONKA W MIDDLE SCHOOL INCLUDINGUNDERPASS, TH 41, CHANHASSEN-CONSTRUCTPED/BIKE TRAIL, UNDERPASS, ETC2.6 EN PEDESTRIANBIKE TRAILTEA 1,362,500 1,090,000 00 0 272,500<strong>15</strong>44 CSAH 11 010-611-006 CARVER COUNTY CARVER CSAH 10 TO TH 212, CHASKA-RECONSTRUCT 1.5 RC GRADE AND UG 5,925,988 2,805,968 00 0 3,120,020WITH PORTION ON NEW ALIGNMENT, INCLUDES PED/BIKESURFACETRAIL<strong>15</strong>45 CSAH 42 019-642-044 DAKOTA COUNTY **MN223**AT TH 52 INTERCHANGE IN ROSEMOUNT-RIGHT 0.0 RW RIGHT OF WAY HPP 11,000,000 2,624,675 00 0 8,375,325OF WAY FOR RECONSTRUCTION OF INTERCHANGE(SAFETEA-LU)<strong>15</strong>46 CSAH 42 019-642-045 DAKOTA COUNTY **MN223**AT TH 52 INTERCHANGE IN ROSEMOUNT-0.0 PL PLANNINGHPP 375,000 300,000 00 0 75,000PRELIMINARY ENGINEERING FOR RECONSTRUCTION OFINTERCHANGE (SAFETEA-LU)<strong>15</strong>47 MN 55 027-030-014 HENNEPIN COUNTY **MN120**ENVIRONMENTAL STUDIES & RW ACQUISITION 21.0 PL PLANNINGHPP 600,000 480,000 00 0 120,000FOR TH 55 CORRIDOR PROTECTION PROJECT(I-494 TOCROW RIVER) (SAFETEA-LU)<strong>15</strong>48 MN 55 027-596-005 HENNEPIN COUNTY **MN120** RIGHT OF WAY ACQUISITION FOR TH 5521.0 RW RIGHT OF WAY HPP 834,501 667,601 00 0 166,900CORRIDOR PROTECTION PROJECT(ALONG CR 116 AT TH55) (SAFETEA-LU)<strong>15</strong>49 CSAH 3 027-603-049 HENNEPIN COUNTY **MN061**LAKE ST ACCESS TO I-35W, MPLS-PURCHASE 0.0 RW RIGHT OF WAY HPP 8,941,500 8,941,500 00 0 0RW(2003 APPROPRIATIONS ACT)September 2011Project Listing Page III - 116 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!