12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: DULUTH-SUPERIOR METROPOLITAN INTERSTATE COMMITTEEFiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other145 BB TRF-0016-<strong>15</strong>A DULUTH TRANSIT SECT 5307: DULUTH DIAL-A-RIDE TRANSIT OPERATING 0.0 B9 OPERATE BUS LF 626,621 0 00 0 626,621AUTHORITY ASSISTANCE146 BB TRF-0016-<strong>15</strong>B DULUTH TRANSIT SECT 5307: DULUTH TRANSIT OPERATING ASSISTANCE 0.0 B9 OPERATE BUS FTA 11,111,340 0 0 1,300,000 0 9,811,340AUTHORITY REGULAR ROUTE & PREVENTATIVE MAINTENANCE147 BB TRF-0016-<strong>15</strong>C DULUTH TRANSIT SECT 5307: DULUTH TRANSIT CAPITAL0.0 B9 BUS GRANT FTA 699,856 0 0 559,885 0 139,971AUTHORITYCAPITALIMPROVEMENT148 BB TRF-0016-<strong>15</strong>-JA DULUTH TRANSIT SECT 5316: JARC URBAN OPERATING FUNDS FOR DULUTH 0.0 JA OPERATE BUS FTA 383,000 0 0 191,500 0 191,500AUTHORITY TRANSIT AUTHORITY164 CSAH 9 069-609-038 ST LOUIS COUNTY FROM JCT CSAH 13 (MIDWAY RD) TO JCT CSAH 4 (RICE 6.0 RD BITUMINOUS STP 5,625,000 2,500,000 00 0 3,125,000LAKE RD), PAVEMENT RECLAMATIONRECLAMATION166 PED/BIKE 118-090-021 DULUTH CROSS CITY TRAIL PHASE IV, M182 TO LAKEWALK TRAIL 0.6 EN PED./BIKE TEA 700,000 500,000 00 0 200,000CONNECTORIMPROVEMENT167 MSAS 173 118-173-007 DULUTH WEST FIRST STREET RECONSTRUCTION FROM MESABA 1.0 RC GRADE AND STP 2,000,000 920,000 00 0 1,080,000AVE TO PIEDMONT AVESURFACE176 I 35 6982-290AC3 MNDOT BOUNDARY AVE TO 26TH AVE E, PAVEMENT REPL &REPAIRS, BR REPL BR #S 69831, 69832, 69880 & REPAIRSBR #S 69851, 69852, 69879 + SPOT REPAIRS AT 21ST AVE WINTERCHANGE, REMOVE BR #S 69835 & 69828 NEAR 27THAVE W, SAFETY IMPROVEMENTS (AC PAYBACK 3 OF3)10.0 BR BRIDGEREPLACEMENTIM 6,6<strong>15</strong>,638 6,6<strong>15</strong>,638 00 0 0182 MN 999 8801-BR4M-<strong>15</strong> MNDOT BETTER ROADS BACKFILL FOR SP 0905-330.0 RS MILL AND NHS 4,658,000 3,726,400 00 931,600 0OVERLAY$32,419,455 $14,262,038 $0 $2,051,385 $931,600 $<strong>15</strong>,174,432September 2011MPO Project Listing A-1 Page 6 of 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!