12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Highway Safety Improvement ProjectsFiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq # ATPRouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other175 1 I 35 0980-143 MNDOT 2 MILES SOUTH TO MIDWAY RD, CABLE MEDIAN 1.8 SH GUARD RAIL HSIP 188,044 169,240 00 18,804 0BARRIER INSTALLATION (ASSOC. SP 6982-299)185 1 LOCAL 999 8801-SHL-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDE - LOCAL HSIP/HRRR 0.0 SH SAFETY TARGET HSIP 768,000 691,200 00 0 76,800PROJECTS186 1 MN 999 8801-SHS-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDE - MNDOT HSIP PROJECTS 0.0 SH SAFETY TARGET HSIP 579,956 521,960 00 57,996 0361 2 MN 999 8802-SHL-<strong>15</strong> ATP 2 DISTRICTWIDE - SAFETY PROGRAM - LOCAL - 20<strong>15</strong> 0.0 SH SAFETY TARGET HSIP 500,000 450,000 00 0 50,000362 2 MN 999 8802-SHS-<strong>15</strong> MNDOT DISTRICTWIDE HSIP TH FUND - FY 20<strong>15</strong> 0.0 SH SAFETY TARGET HSIP 352,941 317,647 00 35,294 0657 3 LOCAL 999 8803-SHL-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - HIGHWAY SAFETY 0.0 SH SAFETY TARGET HSIP 2,078,431 1,870,588 00 0 207,843IMPROVEMENT PROGRAM - 20<strong>15</strong>658 3 TH 999 8803-SHS-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - DISTRICT 3 HSIP 0.0 SH SAFETY TARGET HSIP 1,244,444 1,120,000 00 124,444 0SHARE - 20<strong>15</strong>834 4 LOCAL 999 8804-SHL-<strong>15</strong> LOCAL DISTRICTWIDE SETASIDES - SAFETY (LOCAL 0.0 SH STRIPINGHSIP 666,000 600,000 00 0 66,000HSIP) - 20<strong>15</strong>835 4 MN 999 8804-SHS-<strong>15</strong> MNDOT DISTRICTWIDE SAFETY IMPROVEMENTS (STATE 0.0 SH MISCELLANEOUS HSIP 539,200 485,300 00 53,900 0HSIP) - 20<strong>15</strong>1084 6 MN 999 8806-LT-<strong>15</strong>S MNDOT DISTRICTWIDE SETASIDES - LIGHTING - 20<strong>15</strong> 0.0 SH LIGHTINGHSIP 50,000 45,000 00 5,000 01087 6 LOCAL 999 8806-SHL-<strong>15</strong> LOCAL HSIP/HRRR SETASIDE - LOCAL - 20<strong>15</strong> 0.0 SH SAFETY TARGET HSIP 1,429,412 1,429,412 00 0 01088 6 MN 999 8806-SHS-<strong>15</strong> MN/DOT HSIP/HRRR SETASIDE - MN/DOT - 20<strong>15</strong> 0.0 SH SAFETY TARGET HSIP 989,216 890,294 00 98,922 01297 7 LOCAL 999 8807-SHL-<strong>15</strong> LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 20<strong>15</strong> 0.0 SH SAFETY TARGET HSIP 804,445 724,000 00 0 80,4451298 7 MN 999 8807-SHS-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - MNDOT HSIP0.0 SH SAFETY TARGET HSIP 490,000 441,000 00 49,000 0PROJECTS - 20<strong>15</strong>1483 8 LOCAL 999 8808-SHL-<strong>15</strong> MNDOT DISTRICTWIDE LOCAL SETASIDES - HSIP - 2014 0.0 SH SAFETY TARGET HSIP 733,333 660,000 00 0 73,3331484 8 MN 999 8808-SHS-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - HSIP - 20<strong>15</strong> 0.0 SH SAFETY TARGET HSIP 617,778 556,000 00 61,778 02102 M LOCAL 999 880M-SHL-<strong>15</strong> MN/DOT METRO ATP SETASIDE FOR HSIP PROJECTS YET 0.0 SH SPOTHSIP 8,900,000 8,010,000 00 0 890,000TO BE SELECTED FOR FY 20<strong>15</strong>IMPROVEMENT2267 C TH 999 880C-HSP-<strong>15</strong> MNDOT STRATEGIC HIGHWAY SAFETY PLAN - LOW COST 0.0 SH MEDIAN BARRIER HSIP 495,000 495,000 00 0 0SAFETY IMPROVEMENTS2279 C TH 999 880C-TZD-<strong>15</strong> MNDOT TOWARDS ZERO DEATH BEHAVORIAL STRATEGIES 0.0 SH TZD BEHAVIOR HSIP 1,<strong>15</strong>0,000 1,035,000 00 0 1<strong>15</strong>,000EDUCATION, ENFORCEMNT, EVALUATION,STRATEGIESPROGRAM SUPPORT)$22,576,199 $20,511,641 $0$0 $505,138 $1,559,421September 2011HSIP Project Listing A-3 Page 12 of 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!