12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other<strong>15</strong>64 PED/BIKE 091-090-047 DAKOTA COUNTY PINE BEND BLUFFS TRAILHEAD TO 117TH ST, INVER1.5 EN PEDESTRIAN TEA 1,500,000 943,312 00 0 556,688GROVE HTS-CONSTRUCT MISS RIVER REGIONALBIKE TRAILPED/BIKE TRAIL<strong>15</strong>65 PED/BIKE 091-090-050 SAINT PAUL **MN181**BIKE TR/BRIDGE OVER RR & WARNER RD,0.0 BT GRADE AND HPP 999,850 799,880 00 0 199,970BRUCE VENTO REGIONAL TRAIL TO MISS RIVER CORRSURFACETRAIL, ST PAUL-CONSTRUCTION (SAFETEA-LU)<strong>15</strong>66 PED/BIKE 091-090-056 SAINT PAUL PARKS CHEROKEE REGIONAL PARK-CONSTRUCT PED/BIKE1.3 EN PEDESTRIAN TEA 2,640,000 1,090,000 00 0 1,550,000& REC TRAIL, OVERLOOKS, ETC ALONG S BLUFF OF MISS RIVERBIKE TRAIL<strong>15</strong>67 PED/BIKE 091-090-057 DAKOTA COUNTY MISS RIVER REG TR, SCHARRS BLUFF TO MISS RIVER, 1.6 EN PED./BIKETEA 1,290,240 1,032,192 00 0 258,048SPRING LK RARK RESERVE, NININGER TWP-CONSTRUCTIMPROVEMENTPED/BIKE TR & TRAILHEAD FACILITY<strong>15</strong>68 PED/BIKE 091-090-058 DAKOTA COUNTY TH 110 TO GARLOUGH ELEMENTARY, WEST ST PAUL- 1.1 EN PEDESTRIAN TEA 992,600 794,080 00 0 198,520CONSTRUCT N URBAN REG TR INCLUDING UNDERPASSBIKE TRAIL<strong>15</strong>69 PED/BIKE 091-090-059 DAKOTA COUNTY MISS RIVER REG TR, 117TH ST TO SPRING LK REG PARK, 3.7 EN PEDESTRIAN TEA 2,500,000 1,090,000 00 0 1,410,000ROSEMOUNT-CONSTRUCT PED/BIKE TRAILBIKE TRAIL<strong>15</strong>70 PED/BIKE 091-090-060 RAMSEY COUNTY ALONG LOWER AFTON RD, MCKNIGHT RD TO PT1.0 EN PEDESTRIAN TEA 981,000 784,800 00 0 196,200PARKS DOUGLAS RD, ST PAUL-CONSTRUCT PAVED PED/BIKEBIKE TRAILTRAIL<strong>15</strong>71 CITY 098-080-034 NEWPORT **MN34** NEWPORT NORTH RAVINE, STERLING TOHASTINGS AVE, NEWPORT-EROSION & RATE CONTROLPROJECT TO PROVIDE RELIEF TO WAKOTA STORMWATER SYSTEM0.4 DR GRADE ANDSURFACEHPP 1,594,185 564,185 00 0 1,030,000<strong>15</strong>72 US 10 103-010-016 ANOKA COUNTY **MN196**US 10 CORRIDOR IMPROVEMENTS, CITY OF 3.0 PL PLANNINGHPP 1,349,850 1,079,880 00 0 269,970ANOKA - PE (SAFETEA-LU)<strong>15</strong>73 CMAQ 103-080-002 ANOKA CONSTRUCT - 400- STALL STRUCTURED PARKING0.0 TR BUS GRANT CMAQ 11,000,000 5,885,000 00 0 5,1<strong>15</strong>,000FACILITY ADJACENT TO PROPOSED NORTHSTARCAPITALCOMMUTER RAIL STATIONIMPROVEMENT<strong>15</strong>74 PED/BIKE 107-090-005 BLOOMINGTON LONG MEADOW LAKE, BLOOMINGTON-REPLACE BR 3145 0.0 EN PED./BIKETEA 3,210,000 1,070,000 00 0 2,140,000ON OLD CEDAR AVE WITH A PED/BIKE BOARDWALKIMPROVEMENT<strong>15</strong>75 PED/BIKE 107-090-006 BLOOMINGTON 20TH AVE TO 22ND AVE, BLOOMINGTON-CONSTRUCT 0.0 EN PEDESTRIAN TEA 1,980,000 1,008,000 00 0 972,000PED/BIKE BRIDGE OVER KILLEBREW DR SO OF MALL OFBIKE BRIDGEAMERICA<strong>15</strong>76 PED/BIKE 120-020-037 EDINA LYNMAR LANE TO E OF FRANCE AVE NEAR 72ND ST S, 0.1 EN PED./BIKETEA 2,180,000 1,090,000 00 0 1,090,000EDINA-CONSTRUCT PED/BIKE BRIDGE OVER FRANCE AVEIMPROVEMENT<strong>15</strong>77 PED/BIKE 127-091-001 FRIDLEY SECT 1807: NON-MOTORIZED PILOT PROGRAM IN TWIN 0.5 BT PEDESTRIAN FFM <strong>15</strong>0,000 110,000 00 0 40,000CITIES -NICE RIDE MINNESOTA-MPLS & PARTS OF STBIKE TRAILPAUL EXPANSIONSeptember 2011Project Listing Page III - 118 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!