12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 1Fiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other<strong>15</strong>9 PED/BIKE 036-090-002AC KOOCHICHING SECOND CREEK TO RANIER, WIDEN TRAIL TO MEET1.5 EN PED./BIKETEA 207,720 207,720 00 0 0COUNTY STANDARDS (AC PAYBACK 1 of 1)IMPROVEMENT160 CSAH 61 038-661-009 LAKE COUNTY FROM THE JCT OF TH 61 TO THE JCT OF THE SALAKKA 5.6 RS MILL ANDSTP 750,000 600,000 00 0 <strong>15</strong>0,000RD, MILL & OVERLAYOVERLAY161 CSAH 46 058-646-029 PINE COUNTY FROM THE JCT OF PINE CSAH 49 TO JCT TH 23 AT4.3 RS MILL ANDSTP 1,000,000 800,000 00 0 200,000KERRICK, MILL & OVERLAY, GUARDRAIL ON BR # 58533OVERLAY162 PED/BIKE 069-090-029 ST LOUIS COUNTY MOUNTAIN IRON BICYCLE AND PEDESTRIAN1.6 EN PED./BIKETEA 343,200 274,560 00 0 68,640CONNECTIONIMPROVEMENT163 PED/BIKE 069-090-030 REGIONAL RAIL MESABI TRAIL, SOUDAN TO ELY, BIKE/PED TRAIL4.0 EN PED./BIKETEA 492,000 393,600 00 0 98,400AUTHORITYIMPROVEMENT164 CSAH 9 069-609-038 ST LOUIS COUNTY FROM JCT CSAH 13 (MIDWAY RD) TO JCT CSAH 4 (RICE 6.0 RD BITUMINOUS STP 5,625,000 2,500,000 00 0 3,125,000LAKE RD), PAVEMENT RECLAMATIONRECLAMATION165 PED/BIKE 091-070-024 ARDC HELMET HERO BICYCLE EDUCATION PROGRAM0.0 EN PED./BIKETEA 71,868 57,494 00 0 14,374IMPROVEMENT166 PED/BIKE 118-090-021 DULUTH CROSS CITY TRAIL PHASE IV, M182 TO LAKEWALK TRAIL 0.6 EN PED./BIKETEA 700,000 500,000 00 0 200,000CONNECTORIMPROVEMENT167 MSAS 173 118-173-007 DULUTH WEST FIRST STREET RECONSTRUCTION FROM MESABA 1.0 RC GRADE AND STP 2,000,000 920,000 00 0 1,080,000AVE TO PIEDMONT AVESURFACE168 MSAS 9051 131-203-003 HIBBING SOUTH SALMI ROAD IN THE CITY OF HIBBING,1.8 RC GRADE AND STP 1,400,000 700,000 00 0 700,000RECONSTRUCTIONSURFACE169 MN 11 3604-73M MN/DOT LOMAN TO PELLAND, MILL & OVERLAY, SHOULDER11.4 RS MILL ANDSF FFM 6,636,000 2,143,000 00 4,493,000 0WIDENINGOVERLAY170 MN 18 0103-10 MN/DOT AITKIN CO LINE TO JCT TH 65, MILL & OVERLAY7.3 RS MILL ANDSTP 2,384,000 1,907,200 00 476,800 0OVERLAY171 MN 23 0901-5554A MN/DOT 9.0 MI NE OF SOUTH CARLTON CO LINE, REPLACE BR # 0.0 BR BRIDGESTP 1,481,208 1,184,966 00 296,242 05554 AND APPROACHESREPLACEMENT172 MN 23 0901-67 MN/DOT <strong>15</strong>.9 MI NE OF SOUTH CARLTON CO LINE, REPLACE BR # 1.0 BR BRIDGEBR 5,017,471 4,013,977 00 1,003,494 05470 AND APPROACHESREPLACEMENT173 MN 23 0901-8501 MN/DOT 9.5 MI NE OF SOUTH CARLTON CO LINE, REPLACE BR # 0.0 BR BRIDGESTP 772,024 617,619 00 <strong>15</strong>4,405 08501 (BOX CULVERT)REPLACEMENT174 MN 23 5803-5549 MN/DOT 0.1 MI NE OF DUQUETTE, REPLACE BR # 5549 ANDAPPROACHES0.0 BR BRIDGEREPLACEMENTSTP 1,087,145 869,716 00 217,429 0September 2011Project Listing Page III - 16 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!