12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

III.PROGRAM LISTINGThe following section contains the FY <strong>2012</strong>-20<strong>15</strong> <strong>STIP</strong>project listing sorted by District/ATP.The first page of each District/ATP shows theDistrict/ATP location within the state and the countiesincluded within each District/ATP. The name of theDistrict Transportation Engineer, phone number, andaddress are shown as well as a general informationtelephone number.The second page begins the listing of projects in thatDistrict/ATP sorted by Fiscal Year. Within each FiscalYear, projects are sorted by Route System with transitprojects first followed by rail, local roadway, and thenstate projects.The following information is provided for each projectSeq # - The sequence number is a uniquenumber assigned to each project in thisproject listing.Route - The route name and number on whichSystem the project is located. See Figure 5.Route SystemBBCITYCMAQCRCSAHDAENFHIIRRITSLOCAL 999MSASMUNPED/BIKEPLRECTRAILRRMN or USTH 999TWNFigure 5Route System CategoriesDescriptionTransit (buses)City projectCongestion Mitigation and Air QualityCounty RoadCounty State Aid HighwayDisability ActEnhancement (not assigned to a specificroad and not a pedestrian or bicyclepath)Forest HighwayInterstate HighwayIndian Reservation Roads and BridgesIntelligent Transportation SystemsLocal project not associated with a roadMunicipal State Aid StreetMunicipal StreetPedestrian or Bike Path/Trail (notassigned to a specific road)PlanningDNR Recreational TrailRailroadTrunk HighwayState project not associated with a road(not an Enhancement)Township RoadIII-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!