12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: LACROSSE-LACRESCENT AREA PLANNING COMMITTEEFiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other847 BB TRF-3780-12 LA CRESCENT SECT 5307: LA CRESCENT TRANSIT OPERATING0.0 B9 OPERATE BUS FTA 287,571 0 0 92,000 0 195,571ASSISTANCE909 I 90 8580-149 MN/DOT **BP08** DRESBACH BRIDGE 9320 OVER MISSISSIPPIRIVER - BRIDGE REHABILITATION - INCLUDES $21.45MSBPF (30%) AND $71.5M TH BONDS - AC PROJECT,PAYBACK IN 2013 AND 20140.3 BR BRIDGEREPLACEMENTIM BF 140,430,000 21,450,000 50,050,0000 0 118,980,000$140,717,571 $21,450,000 $50,050,000 $92,000 $0 $119,175,571September 2011MPO Project Listing A-1 Page 24 of 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!