12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: MFiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other2054 I 35W 2782-3<strong>15</strong> MNDOT FROM 42ND ST IN MPLS TO 66TH ST IN RICHFIELD -4.0 RB LANDSCAPING SF 200,000 0 00 200,000 0CORRIDOR LANDSCAPING2055 I 35W 2783-134 MNDOT STORMWATER TUNNEL SOUTH OF MISSISSIPPI RIVER TO 0.8 RD STORM SEWER LF 2,655,000 0 00 0 2,655,000I35W/I94 COMMONS IN MINNEAPOLIS-TUNNEL REPAIRREPAIR2056 MN 36 6212-148 MN/DOT OVER LEXINGTON AVENUE IN ROSEVILLE-REPLACE1.0 BR BRIDGENHS 12,000,000 7,200,000 12,000,0000 4,800,000 0BRIDGE 5723(AC PROJECT, PAYBACK 1 OF 1 IN 2016)REPLACEMENT2057 MN 36 8214-114 MN/DOT FROM EAST END TUENGE ROAD TO ST CROIX RIVER INSTILLWATER, OAK PARK HTS, & BAYPORT -RECONSTRUCT INCLUDING FR RDS, OSGOODINTERSECTION, INTERCHANGE AT TH 95, BRIDGE 82043AT BEACH RD2.6 RC GRADE ANDSURFACEBF 44,720,000 0 00 0 44,720,0002058 MN 36 8214-114MIT<strong>15</strong> MN/DOT OVER ST CROIX RIVER NEAR STILLWATER-MITIGATION 0.2 BR BRIDGEBF 1,900,000 0 00 0 1,900,000ITEMS FOR REPLACEMENT OF RIVER BRIDGE 4654REPLACEMENT2059 MN 36 8214-147 MN/DOT W OF NORTHWESTERN AV TO E OF TUENGE RD IN CITY 0.7 RC GRADE AND BF 16,750,000 0 00 0 16,750,000OF OAK PK HGT & STILLWATER-RECONSTRUCTSURFACEINCLUDING FR RDS & INTERSECTIONS2060 MN 36 8217-82045AC1 MN/DOT OVER ST CROIX RIVER NEAR STILLWATER & OAK PARK 0.2 BR BRIDGEBR 51,000,000 51,000,000 00 0 0HEIGHTS-NEW BRIDGE 82045 OVER ST. CROIX RIVER,REPLACEMENTINCLUDING RAMPS ON & OFF TH 95 (AC PAYBACK 1 OF 2)2061 MN 51 6216-130 MN/DOT AT RAMSEY COUNTY ROAD E IN ARDEN HILLS-REPLACE 0.0 BR BRIDGESTP 2,070,000 1,656,000 00 414,000 0BRIDGE 62010 TO ACCOMMODATE A PEDESTRIAN TRAIL,REPLACEMENTAPPROACH PANEL WORK, DRAINAGE, GUARDRAIL2062 US 52 1928-60 MNDOT FROM SOUTHVIEW BLVD IN SOUTH ST PAUL TO PLATO 4.3 SC LIGHTINGNHS 1,062,000 849,600 00 212,400 0BLVD IN ST PAUL - REPLACE LIGHTING SYSTEMS2063 MN 55 2722-82 MNDOT AT HENNEPIN CSAH 101/SIOUX TRAIL IN MEDINA -0.0 SC TRAFFIC SIGNAL SF LF 300,000 0 00 <strong>15</strong>0,000 <strong>15</strong>0,000REPLACE TEMPORARY WOOD POLE SIGNAL SYSTEMREVISIONWITH PERMANENT SIGNAL SYSTEM2064 US 61 6222-166 MNDOT AT BUERKLE ROAD IN VADNAIS HEIGHTS - SIGNAL0.0 SC TRAFFIC SIGNAL SF LF 250,000 0 00 125,000 125,000REPLACEMENT INCLUDING ADA/PEDESTRIAN UPGRADESREVISION2065 MN 62 2763-47 MNDOT FROM I-494 IN EDEN PRAIRIE TO TH 55 IN MPLS (EXCEPT 12.4 SC SIGNINGSF 650,000 0 00 650,000 0MN62/I35W COMMONS AREA) AND US212 FROM I494 TOMN62 IN EDEN PRAIRIE-SIGN REPLACEMENT2066 MN 65 0207-99 MNDOT AT 41ST AVE NE IN COLUMBIA HEIGHTS - REPLACE0.0 SC TRAFFIC SIGNAL SF LF 280,000 0 00 140,000 140,000TRAFFIC SIGNAL AND ADA IMPROVEMENTSREVISIONSeptember 2011Project Listing Page III - <strong>15</strong>6 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!