12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure C-1Minnesota Detailed Financial Plan <strong>2012</strong>-20<strong>15</strong> ($ - Millions)SFY <strong>2012</strong> SFY 2013 SFY 2014 SFY 20<strong>15</strong>TH SA Total TH SA Total TH SA Total TH SA Total(1) <strong>STIP</strong> Total 325 <strong>15</strong>8 483 306 177 482 303 166 469 329 141 470(2) Regular Federal Funds (RFF) 251 <strong>15</strong>1 402 256 168 424 277 163 439 249 138 387(3) AC Conversions Planned 74 7 82 50 9 59 27 3 30 80 3 83New Managed AC(4) Managed Regular Federal Funds 51 31 82 31 21 52 22 13 4 7 4 11(4a) % of RFF Required for Fiscal Constraint 21% 12% 8% 3%Conversions of New Managed AC(5) Year 1 = 30% <strong>15</strong> 9 25 9 6 16 7 4 11 2 1 3(6) Year 2 = 50% 0 0 0 26 <strong>15</strong> 41 16 10 26 11 7 18(7) Year 3 = 20% 0 0 0 0 0 0 10 6 16 4 3 7Subtotal <strong>15</strong> 9 25 35 22 57 33 20 53 18 10 28Actual Needs(8) Regular Federal Funds 199 120 319 224 148 372 254 <strong>15</strong>0 435 242 135 376(9) Planned Conversions 74 7 82 50 9 59 27 3 30 80 3 83(10) Deferred Conversions 0 0 0 0 0 0 0 0 0 0 0 0(11) Managed Conversions – New <strong>15</strong> 9 25 35 22 57 33 20 53 18 10 28(12) Managed Conversions – Carry forward 61 0 61 0 0 0 0 0 0 0 0 0Total Actual Needs 350 137 487 309 178 487 314 173 487 339 148 487Lines 1-3 can be found in the <strong>STIP</strong>Line 10 shows the adjustment for conversions to subsequent years.Line 4 represents the amount of new AC projects (Line 2 x %) Line 11 is the amount of conversion that will occur based on historical assumption (Lines 5-7)Line 4(a) represents the new managed AC as a percentage.Line 12 is the amount of the conversion that will occur due to carry forward AC conversionsLines 5-7 represent the amount of conversions that will occur as related to the new AC (Line 4 x 30/50/20%) TH = Trunk Highway, SA = State AidLine 8 shows the net amount of regular federal funds that will be used (Line 2 minus Line 4)Line 9 shows the conversions requested by the ATP’s (Line 3) Differences due to rounding Excludes EarmarksC-1(2)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!