12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: MFiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1834 MN 36 6212-164 MNDOT JUST E OF SNELLING AVE, ROSEVILLE - LINE CULVERT & 0.0 DR CULVERTSF 220,000 0 00 220,000 0INSTALL NEW APRONS ON BOTH SIDES OF CULVERTREPLACEMENT1835 MN 36 6212-167 MN/DOT OVER KELLER LAKE IN MAPLEWOOD-REPLACE BR 57<strong>15</strong> & 0.2 BR BRIDGENHS 3,730,000 2,984,000 00 746,000 0APPROACHES, GUARDRAIL, STORM SEWER AND PONDSREPLACEMENT1836 MN 36 8204-56 MNDOT MN120 TO STILLWATER BLVD N - REPAIR AND REPLACE 9.4 DR STORM SEWER SF 735,000 0 00 735,000 0DETERIORATING PIPES, STRUCTURES & APRONS ANDREPAIRREPLACE & GUARDRAIL1837 MN 36 8214-114MIT13 MN/DOT OVER ST CROIX RIVER NEAR STILLWATER-MITIGATION 0.2 BR BRIDGEBF 7,200,000 0 00 0 7,200,000ITEMS FOR REPLACEMENT OF RIVER BRIDGE 4654REPLACEMENT1838 MN 36 8217-4654E MN/DOT **ELLA**OVER ST. CROIX RIVER IN STILLWATER-0.0 BI BRIDGE REPAIR NHS 3,310,000 1,324,000 00 331,000 1,655,000STILLWATER LIFT BRIDGE STABILIZATION REPAIRPROJECT ON BRIDGE 46541839 MN 47 0205-96 MN/DOT 37TH AVE NE IN COLUMBIA HEIGHTS-REPLACE TRAFFIC 0.0 SC TRAFFIC SIGNAL SF LF 250,000 0 00 125,000 125,000SIGNALREVISION1840 MN 47 0205-97 MNDOT 40TH AVE NE/ANOKA CO CSAH 2 - SIGNAL REPLACEMENT 0.0 SC TRAFFIC SIGNAL SF LF 250,000 0 00 125,000 125,000REVISION1841 MN 47 2726-69 MNDOT TH 65 (CENTRAL AVE) TO 27TH AVE NE IN MPLS - MILL & 2.2 RS MILL ANDSTP 2,500,000 2,000,000 00 500,000 0OVERLAY, DRAINAGE UPGRADES/REPAIRS AND PEDOVERLAYRAMP UPGRADES1842 US 52 1905-33 MNDOT AT DAKOTA CSAH 86 IN RANDOLPH TWP-CONVERT TO A 1.4 SH GRADE AND HSIP 905,300 814,770 00 90,530 03/4 INTERSECTION WITH MEDIAN U-TURNS, EXTENDSURFACETURN LANES AT INTERSECTION, DRAINAGE & LIGHTING1843 US 52 1906-57 MNDOT AT DAKOTA CSAH 66 IN VERMILLION TWP-CONSTRUCT 3/4 1.2 SH GRADE,SURFACE HSIP 910,300 819,270 00 91,030 0INTERSECTION WITH MEDIAN U TURNS, EXTEND TURN& BRIDGELANES AT INTERSECTION, DRAINAGE & LIGHTING1844 US 61 1913-72 MNDOT TH 55, HASTINGS - SIGNAL REPLACEMENT0.0 SC TRAFFIC SIGNAL SF LF 175,000 0 00 131,000 44,000REVISION1845 US 61 6222-168 MNDOT FROM RAMSEY CTY ROAD 30 (LARPENTEUR AVE) TO NJCT RAMSEY CTY ROAD 9/FRENCHMAN RD-COORDINATION & RETIMING OF SIGNALS INCLUDINGCCTV CAMERAS & MESSAGE SIGNS & UPGRADINGSIGNAL CABINETS FOR FUTURE TRANSIT SIGNALPRIORITY12.3 TM PARK AND RIDE CMAQ 1,776,228 1,420,982 00 355,246 01846 MN 62 2774-16 MNDOT UNDER PENN AVE & UNDER XERXES AVE IN MPLS,0.0 BI REDECKNHS 1,590,000 1,272,000 00 318,000 0EDINA, & RICHFIELD-REDECK BRS 7268 & 27504 ANDREPLACE APPROACH PANELSSeptember 2011Project Listing Page III - 139 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!