12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TRANSIT (FHWA)Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq # ATPRouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other<strong>15</strong>94 M CMAQ 164-070-011 SAINT PAUL ARTERIAL RDWY TRAFFIC FLOW IMPROVEMENTS,INSTALL FIBER OPTIC CABLE & TIMINGOPTIMIZATION OF 62 TRAFFIC SIGNAL SYSTEMS,ST PAUL0.0 TM TRAFFIC MGMT.SYSTEMCMAQ 2,065,000 1,340,000 00 0 725,0001670 M MN 65 0207-94 MN/DOT FROM I-694 IN FRIDLEY TO ANOKA CSAH 24 (237THAVE NE) IN EAST BETHEL-CABINET UPGRADES,SIGNAL TIMING, DEPLOYMENT OF CCTVCAMERAS, & VARIABLE MESSAGE SIGNS23.1 TM TRAFFIC MGMT.SYSTEMCMAQ 1,400,000 1,120,000 00 280,000 02145 C BB 880C-TRS-12 MNDOT GREATER MN TRANSIT CAPITAL 0.0 TR PURCHASE BUS STP 1,250,000 1,000,000 00 0 250,000$59,631,388 $40,596,670 $0$0 $280,000 $18,754,718September 2011Transit Project Listing A-4 Page 47 of 56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!