12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1808 PED/BIKE 194-010-010AC CHANHASSEN AT MINNEWASHTA PKWY & TH 5 IN CHANHASSEN-0.0 EN PEDESTRIAN TEA 979,200 979,200 00 0 0CONSTRUCT PED/BIKE UNDERPASS (AC PAYBACK 1 OF 1)BIKE BRIDGE1809 MN 101 194-010-011 CHANHASSEN FROM CARVER CSAH 18(LYMAN BLVD) TO CARVER CSAH 1.1 RC GRADE AND UG 5,726,400 5,426,400 00 0 300,00014(PIONEER TR) IN CHANHASSEN-RECONSTRUCT TO 4-LNSURFACERDWY(FEDERAL MATCH IS UNDER SP 1009-22)1810 MN 5 194-010-012AC CHANHASSEN ON TH 5 AT MINNEWASHTA PKWY & LONE CEDAR LN IN 0.3 SH GRADE AND HSIP 918,000 918,000 00 0 0CHANHASSEN-EB TURN LANE, WIDEN SHOULDERS,SURFACEACCESS CLOSURES(AC PAYBACK 1 OF 1)1811 MN 149 195-010-010 EAGAN FROM TH 55 TO I-494 IN EAGAN-RECONSTRUCT FROM 4- 0.9 RC GRADE AND UG 3,162,000 2,529,600 00 0 632,400LN RDWY TO 6-LN RDWY, TRAILSURFACE1812 PED/BIKE 199-108-003 RAMSEY ALONG MISSISSIPPI RIVER FROM TUNGSTEN ST TO1.9 EN ENHANCEMENT TEA 509,487 387,808 00 0 121,679RAMSEY BLVD IN RAMSEY-CONSTRUCT MISSISSIPPIRIVER TRAIL1813 MN 3 1908-79 MNDOT JUST N OF ANNE MARIE TR IN INVER GROVE HTS TO MN110 IN SUNFISH LAKE-MILL & OVERLAY, CONCRETEREPAIR, CONSTRUCT LEFT TURN LANE, DRAINAGE,GUARDRAIL REPAIRS & REPLACE BIT CURB WITHCONCRETE3.7 RS MILL ANDOVERLAYSF 2,450,000 0 00 2,450,000 01814 MN 5 1002-98 MNDOT FROM EAST JUNCTION CARVER CR11 TO I-494-COORDINATION & RETIMING OF SIGNALS INCLUDINGCCTV CAMERAS, MESSAGE SIGNS & UPGRADING SIGNALCABINETS FOR FUTURE TRANSIT SIGNAL PRIORITY12.5 TM TRAFFIC SIGNALREVISIONCMAQ 1,711,489 1,369,191 00 342,298 018<strong>15</strong> MN 13 1901-148 MNDOT AT CSAH 5 IN BURNSVILLE-CONSTRUCT INTERCHANGE,ACCESS CLOSURES, FRONTAGE RDS($9M INTERCHANGEBONDS, $7M CHP 36 BONDS, $1M SC, $.55K AM) (TIED TOSP 019-605-028)0.6 AM GRADE,SURFACE& BRIDGESF BF 17,550,000 0 00 1,550,000 16,000,0001816 MN 13 1901-162 MN/DOT OVER I35W IN BURNSVILLE-PAINT BRIDGES 9779 & 9780, 1.0 BI BRIDGE REPAIR NHS 585,000 468,000 00 117,000 0GUARDRAIL & DRAINAGEOTHER1817 MN 13 1901-169 MNDOT FROM 0.4 MI W OF I-35W TO I-35W IN BURNSVILLE-0.4 RC GRADE AND SF 825,000 0 00 825,000 0RECONSTRUCT TO CONCRETESURFACE1818 MN 13 7001-108 MNDOT SCOTT CSAH 44 (160TH ST SE)/RIDGEMONT AVE SE IN 0.0 SC TRAFFIC SIGNAL SF LF 280,000 0 00 140,000 140,000PRIOR LAKE-SIGNAL REPLACEMENT AND ADA UPGRADESREVISION1819 MN 13 7001-110 MNDOT FROM US 169 (ON MN 101) IN SHAKOPEE TO LOUISIANA 0.7 RC LANDSCAPING SF 50,000 0 00 50,000 0AVE IN SAVAGE - LANDSCAPING1820 I 35 1380-77 MN/DOT SW QUADRANT OF I35 & CHISAGO CR 22 IN WYOMING- 0.0 TM TRAFFIC MGMT. SF 450,000 0 00 450,000 0PARK & RIDE RECONSTRUCTION, DRAINAGE, LIGHTS,SYSTEMINSTALL CAMERASSeptember 2011Project Listing Page III - 137 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!