12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 7Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1107 RR 22-00114 MNDOT 430TH AVE IN DELAVAN, FARIBAULT COUNTY, INSTALL 0.0 SR RR X-INGRRS 218,056 196,250 00 0 21,806GATES [FED $ CAPPED]IMPROVEMENTS1108 RR 22-001<strong>15</strong> MNDOT 510TH AVE 2 MI E OF EASTON, FARIBAULT COUNTY,0.0 SR RR X-INGRRS 218,056 196,250 00 0 21,806INSTALL GATES [FED $ CAPPED]IMPROVEMENTS1109 CSAH 12 007-612-011 BLUE EARTHCOUNTY**LGA** CSAH 12 & TH 14 BRIDGE #07587 & RAMPS (LOCALGOVERNMENT ADVANCE, 1M PER YEAR STARTING IN2013 TO BE PAID BACK TO THE COUNTY) (TIED 0702-116)(AC PROJECT, Payback in 2013, 2014, 20<strong>15</strong>, 2016 & 2017)0.0 BR NEW BRIDGE STP 2,954,250 1,426,000 4,181,7500 0 1,528,2501110 PED/BIKE 017-591-003 COTTONWOOD **SRTS IN** PE FOR CONSTRUCTION OF SIDEWALK0.0 BT PED./BIKESRTS 12,000 12,000 00 0 0ALONG BUSY STREET TO MIDDLE SCHOOL/HIGH SCHOOLIMPROVEMENTIN WINDOM (SEE 017-591-004 FOR CONST PROJ)1111 PED/BIKE 017-591-004 COTTONWOOD **SRTS IN** 3300' OF TEN FOOT SIDEWALK ALONG BUSY 0.0 BT PED./BIKESRTS 240,919 240,919 00 0 0STREET TO MIDDLE SCHOOL/HIGH SCHOOL IN WINDOMIMPROVEMENT1112 PED/BIKE 032-090-008 JACKSON COUNTY SUNSET BIKE TRAIL PHASE 2 IN THE CITY OF JACKSON 1.6 EN PEDESTRIAN TEA 293,000 234,400 00 0 58,600(FED$CAPPED)BIKE TRAIL1113 TWN 183 032-599-089 JACKSON COUNTY 0.3 MI NORTH OF CSAH 18 (JACKSON CO), REPLACE BR 0.0 BR BRIDGEBROS 435,000 <strong>15</strong>0,000 198,0000 0 285,0002628 (AC PROJECT, PAYBACK IN 2013) FED $ CAPPEDREPLACEMENT1114 CSAH 29 032-629-042 JACKSON COUNTY CSAH 8 TO CSAH 34 (JACKSON CO), OVERLAY &6.0 RS BITUMINOUS STP 2,437,700 1,326,500 00 0 1,111,200SHOULDER WORK (FED $ CAPPED)OVERLAY11<strong>15</strong> LOCAL 999 040-070-001 LE SUEUR COUNTY INTERSECTION LIGHTING ON VARIOUS CSAH & COUNTY 0.0 SH LIGHTINGHSIP 67,000 60,300 00 0 6,700ROADS COUNTY WIDE1116 PED/BIKE 067-090-005 ROCK COUNTY UNDERPASS OF TH 75 IN LUVERNE, ALONG CSAH 50.1 EN PEDESTRIAN TEA 343,020 274,416 00 0 68,604BIKE BRIDGE1117 CR 55 067-598-010 ROCK COUNTY CONSTRUCT NEW BRIDGE OVER SHORT LINE RR OLD 0.0 BR BRIDGE REMOVAL FFM 450,000 350,000 00 0 100,000BR#l2170 (IBRD FUNDS)1118 CSAH 8 067-608-009 ROCK COUNTY 0.2 MI WEST OF CSAH 3 (ROCK CO), REPLACE BR 92760 0.0 BR BRIDGEBROS 348,000 200,000 00 0 148,000(FED $ CAPPED)REPLACEMENT1119 PED/BIKE 072-090-001 SIBLEY GAYLORD TRAIL, PHASE II AROUND CITY STORM POND 2.0 EN PEDESTRIAN TEA 438,970 260,130 00 0 178,840TO TH 5/19 & ALONG LINCOLN AVENUE TO 13TH STREETBIKE TRAIL1120 PED/BIKE 123-591-001 FAIRMONT **SRTS IN** PE FOR CONSTRUCTION OF TRAIL SEGMENTCONNECTING TO FIVE LAKES ELEMENTARY SCHOOL,UPGRADING CROSSWALKS AND CURB RAMPS (SEE 123-591-002 FOR CONST PROJ)0.0 BT PED./BIKEIMPROVEMENTSRTS 13,276 13,276 00 0 01121 PED/BIKE 123-591-002 FAIRMONT **SRTS IN** CE AND CONSTRUCTION OF TRAIL SEGMENT 0.0 BT PED./BIKESRTS 110,788 110,788 00 0 0CONNECTING TO FIVE LAKES ELEMENTARY SCHOOL,IMPROVEMENTUPGRADING CROSSWALKS AND CURB RAMPSSeptember 2011Project Listing Page III - 86 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!