12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 4Fiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other812 RR 03-00124 MNDOT LEGION STREET (MSAS 126), DETROIT LAKES, BECKER 0.0 SR RAILROADRRS 300,000 270,000 00 0 30,000COUNTY, INSTALL GATESSIGNALS813 RR 56-00131 MNDOT CSAH 40, ALMORA, OTTERTAIL COUNTY, INSTALL GATES 0.0 SR RAILROADRRS 300,000 270,000 00 0 30,000SIGNALS814 CSAH 7 003-607-023AC BECKER COUNTY REPLACE BRIDGE #7175 OVER THE BNSF RR IN LAKE 0.1 BR BRIDGESTP 400,000 400,000 00 0 0PARK (AC PAYBACK 1 of 1)REPLACEMENT8<strong>15</strong> CSAH 43 003-643-009 BECKER COUNTY MILL AND OVERLAY FROM THE SOUTH COUNTY LINE TO 3.0 RD MILL ANDSTP 456,175 364,940 00 0 91,235TH 87OVERLAY816 CSAH 45 003-645-003 BECKER COUNTY BITUMINOUS OVERLAY FROM TH 87 TO CSAH 402.8 RS BITUMINOUS STP 425,763 340,610 00 0 85,<strong>15</strong>3OVERLAY817 CSAH 13 021-613-009 DOUGLAS COUNTY BITUMINOUS OVERLAY FROM TH 29 IN CARLOS TO CP 0.9 RS BITUMINOUS STP 202,744 162,195 00 0 40,549RAILROADOVERLAY818 CSAH 42 021-642-012 DOUGLAS COUNTY BITMINOUS OVERLAY FROM CARLOS/LAKE3.3 RS BITUMINOUS STP 608,231 486,585 00 0 121,646LEHOMMEDIEU BRIDGE TO TH 29OVERLAY819 CSAH 46 021-646-005 DOUGLAS COUNTY BITMINOUS OVERLAY FROM CP RAILROAD TO 1.5 MILES 2.1 RS BITUMINOUS STP 405,488 324,390 00 0 81,098NORTH OF CSAH 23OVERLAY820 PED/BIKE 056-090-010 OTTER TAIL LAKE ADLEY PARK TRAIL - PARKERS PRAIRIE0.0 EN ENHANCEMENT TEA 231,250 185,000 00 0 46,250COUNTY821 CSAH 28 056-628-013 OTTER TAIL REPLACE BRIDGE #56508 OVER PELICAN RIVER NEAR 0.1 BR BRIDGESTP 400,000 320,000 00 0 80,000COUNTY ERHARDREPLACEMENT822 CSAH 28 061-628-027 POPE COUNTY BITUMINOUS RECLAMATION AND RESURFACING FROM 3.0 RD BITUMINOUS STP 810,975 648,780 00 0 162,195TH 55 IN LOWRY TO CSAH <strong>15</strong>RECLAMATION823 PED/BIKE 102-090-005 ALEXANDRIA GENEVA ROAD PEDESTRIAN/BIKE LANES - PHASE II0.0 EN ENHANCEMENT TEA 980,000 414,593 00 0 565,407824 MUN 135 102-135-002AC1 ALEXANDRIA URBAN GRADING AND SURFACING ON 50th AVE FROM TH 1.0 MC GRADINGSTP 2,550,000 342,500 00 0 2,207,50029 (BROADWAY AVE) TO CSAH 106 IN ALEXANDRIA (ACPAYBACK 1 OF 2825 MUN 108 117-108-003 DETROIT LAKES US 59 UNDERPASS AT MORROW AVE. & THOMAS ST0.1 MC NEW BRIDGE STP 1,862,500 1,490,000 00 0 372,500EXTENSION IN DETROIT LAKES (TIED TO SP 0301-60)826 MN 9 8402-17 MNDOT JCT MN 55 to JCT US 75 IN DORAN, & JCT MN 28 to MN 27 IN 21.8 RS MILL ANDSTP 10,267,300 8,213,800 00 2,053,500 0HERMAN, & ON MN 55 FROM WENDELL TO US 59OVERLAY827 US 10 0301-60 MNDOT US 10 FROM AIRPORT RD TO US 59, & US 59 FROM US 10 1.6 RC GRADE AND STP 8,578,600 6,462,900 2,000,0000 2,1<strong>15</strong>,700 0TO MORROW AVE. (TIED TO SP 117-108-003) (AC PAYBACKBRIDGEIN 2016)September 2011Project Listing Page III - 65 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!