12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 7Fiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1292 MN 253 2210-112 MNDOT 2.21 MI NORTH OF BRICELYN, OVER EAST FORK BLUE 0.0 BR BRIDGESTP 3,286,000 2,629,000 00 657,000 0EARTH RIVER, REPLACE BR 6876REPLACEMENT1293 MN 999 8807-ADA-<strong>15</strong> MNDOT **ADA** SETASIDE FOR ADA PROJECTS - 20<strong>15</strong>0.0 SC PED./BIKESTP 160,000 130,000 00 30,000 0IMPROVEMENT1294 US 14 8807-PL-<strong>15</strong> MNDOT SAFETY IMPROVEMENTS FROM NICOLLET CSAH 6 TO 14.0 MC GRADE AND NHS 4,000,000 3,200,000 00 800,000 0NEW ULMSURFACE1295 MN 999 8807-RW-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 20<strong>15</strong>0.0 RW RIGHT OF WAY SF 2,000,000 0 00 2,000,000 01296 MN 999 8807-SAS-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - 20<strong>15</strong>0.0 NA MISCELLANEOUS BROS 12,354,583 4,283,666 00 0 10,917STP1297 LOCAL 999 8807-SHL-<strong>15</strong> LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 20<strong>15</strong>0.0 SH SAFETY TARGET HSIP 804,445 724,000 00 0 80,4451298 MN 999 8807-SHS-<strong>15</strong> MNDOT DISTRICTWIDE SETASIDES - MNDOT HSIP PROJECTS - 0.0 SH SAFETY TARGET HSIP 490,000 441,000 00 49,000 020<strong>15</strong>$61,914,913 $31,297,435 $23,274,000 $1,342,000 $11,517,800 $9,697,678September 2011Project Listing Page III - 99 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!