12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: MFiscal Year: 2014<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1926 RR 27-00304 MNDOT PGR ON KELL AVE S, MUN 312 IN BLOOMINGTON-INSTALL 0.0 SR RR X-INGRRS 234,000 210,600 00 0 23,400GATESIMPROVEMENTS1927 RR 62-00203 MNDOT MNNR ON KNOLLWOOD DR, MUN 42 IN NEW BRIGHTON- 0.0 SR RR X-INGRRS 234,000 210,600 00 0 23,400INSTALL GATESIMPROVEMENTS1928 RR 70-00123 MNDOT UP ON CSAH 9 IN JORDAN-UPGRADE TO0.0 SR RR X-INGRRS 312,000 280,800 00 0 31,200GATES(CANTILEVERS)IMPROVEMENTS1929 RR 82-00139 MNDOT UP ON CENTRAL AVE, MUN 46 IN BAYPORT-INSTALL0.0 SR RR X-INGRRS 286,000 257,400 00 0 28,600GATESIMPROVEMENTS1930 RR 82-00140 MNDOT UP ON 10TH AVE N, MUN 4 IN BAYPORT-INSTALL GATES 0.0 SR RR X-INGRRS 338,000 304,200 00 0 33,800IMPROVEMENTS1931 CR 74 002-596-0<strong>15</strong> ANOKA COUNTY ON 221ST AVE NE AT TH 65 IN EAST BETHEL-NEW0.1 SH GRADE AND HSIP 1,248,000 1,123,200 00 0 124,800TRAFFIC SIGNAL INSTALLATION, TURN LANESURFACECONSTRUCTION ON CR 741932 CR 3 002-596-020 ANOKA COUNTY ON ANOKA CR 3 (COON RAPIDS BLVD) AT SPRINGBROOK 0.2 SH SPOTHSIP 520,000 468,000 00 0 52,000DR IN COON RAPIDS - TRAFFIC SIGNAL REBUILD,IMPROVEMENTLENGTHEN TURN LANES1933 CSAH 5 002-605-018 ANOKA COUNTY ON ANOKA CSAH 5 AT ALPINE DRIVE IN RAMSEY -0.0 SH GRADE AND HSIP 1,040,000 936,000 00 0 104,000TRAFFIC SIGNAL, CONSTRUCT LEFT & RIGHT TURN LANESSURFACE1934 CSAH 11 002-611-032 ANOKA COUNTY ON ANOKA CSAH 11 (FOLEY BLVD) FROM 101ST TO0.0 RC GRADE AND UG 3,031,600 2,425,280 00 0 606,320EGRET IN COON RAPIDS - RECONSTRUCT TO 4 - LNSURFACERDWY, NEW SIGNALS, TRAIL1935 CSAH 51 002-651-007 ANOKA COUNTY FROM ANOKA CSAH 12 TO 121ST AVE IN COON RAPIDS & 1.5 RC GRADE AND UG 7,956,000 6,364,800 00 0 1,591,200BLAINE - RECONSTRUCT TO 4 - LANE RDWY, PED/BIKE,SURFACESIGNALS1936 CSAH 78 002-678-020 ANOKA COUNTY ON ANOKA CSAH 78 (HANSON BLVD) AT ANOKA CSAH 20 0.2 SH SPOTHSIP 936,000 842,400 00 0 93,600(161ST AVE NW) IN ANDOVER - CONSTRUCT TRAFFICIMPROVEMENTSIGNAL, TURN LANES AT ALL LEGS1937 CSAH 18 010-618-013 CARVER COUNTY ON CARVER CSAH 18 (LYMAN BLVD) FROM CARVER CSAH 0.6 RC GRADE AND UG 6,222,000 4,977,600 00 0 1,244,400<strong>15</strong> (AUDUBON RD) TO CARVER CSAH 17 (POWERS BLVD)SURFACEIN CHANHASSEN-RECONSTRUCT TO 4 - LN RDWY1938 CSAH 32 019-632-028 DAKOTA COUNTY ON DAKOTA CSAH 32 AT NICOLLET AVE IN BURNSVILLE- 0.0 SH GRADE AND HSIP 364,000 327,600 00 0 36,400CONSTRUCT WB LEFT TURN LANE AND CHANNELIZATIONSURFACE1939 CSAH 5 027-605-029 HENNEPIN COUNTY HENNEPIN CSAH 5 (FRANKLIN AVE) OVER W RIVER RD & 0.2 BR BRIDGE REPAIR BR 19,200,000 8,320,000 00 0 10,880,000MISSISSIPPI RIVER - RECONDITION BR 2441OTHERSeptember 2011Project Listing Page III - 146 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!