12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: MFiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1862 US 169 2750-75 MNDOT AT 93RD AVENUE (HENNEPIN CSAH 30) IN BROOKLYNPARK AND OSSEO-CONVERT EXISTING INTERSECTIONTO A FOLDED DIAMOND HALF INTERCHANGE(INTERCHANGE BONDS)0.0 RC GRADE,SURFACE& BRIDGESF BF 11,975,000 0 00 5,975,000 6,000,0001863 MN 169 2772-96 MN/DOT OVER NINE MILE CREEK IN EDINA, OVER EXCELSIOR 1.7 BI BRIDGE REPAIR SF 1,675,000 0 00 1,675,000 0BLVD, 3RD AVE AND RR & OVER 2ND ST IN HOPKINS-OTHERREHAB BRIDGES 27568, 27586 & 27587, GUARDRAIL1864 US 169 2776-03AC2 MN/DOT HIGHWAY 169/I494 INTERCHANGE IMPROVEMENTS,0.2 MC GRADE,SURFACE UG 8,000,000 8,000,000 00 0 0MN(AC PAYBACK 2 0F 3)& BRIDGE1865 US 169 7005-88 MN/DOT MARSCHALL RD(SCOTT CSAH 17) TO SB 3RD LANE DROP, 2.3 TM TRAFFIC MGMT. SF 500,000 0 00 500,000 0SHAKOPEE-TRAFFIC MGMT SYSTEMSYSTEM1866 MN 252 2748-59 MNDOT AT 66TH AVE N IN BROOKLYN CENTER-REPLACE EB 66THAVE FREE RIGHT AT TH 252 WITH RIGHT TURN LANE &REPLACE TRAFFIC SIGNAL, ADA UPGRADES, NEWDRAINAGE STRUCTURES0.0 SC GRADE ANDSURFACESF LF 350,000 0 00 225,000 125,0001867 MN 280 6242-9472 MNDOT UNIVERSITY AVE OVER TH 280 AND CEDAR AVE OVER I- 0.0 BI BRIDGE REPAIR SF 425,000 0 00 425,000 035E IN ST PAUL-REPAIR/MODIFY BRS 9472 & 62889 FOROTHERCENT CORR LRT-DEBT MGMT1868 MN 284 1014-<strong>15</strong> MN/DOT E 10TH ST, WACONIA-CONSTRUCT ROUNDABOUT0.0 AM SPOTSF LF 1,000,000 0 00 400,000 600,000IMPROVEMENT1869 I 394 2789-133 MN/DOT WB TO I494 NB & SB EXIT RAMPS, MINNETONKA - MODIFY 0.3 SC GRADE AND SF 690,000 0 00 690,000 0CO RD-CONVERT TO INDIVIDUAL EXITS FOR I394 WB TOSURFACEI494 NB & SB, M/O1870 I 494 2785-364 MNDOT FROM 35W TO TH 100 IN BLOOMINGTON AND RICHFIELD - 1.9 MC GRADE AND NHS 8,230,000 6,584,000 00 1,646,000 0ADD AUXILIARY LANE IN WB DIRECTION, NOISE WALL,SURFACEDRAINAGE, PONDING, LIGHTING AND TMS1871 I 494 2785-367 MNDOT FROM JUST W OF 34TH AVE TO JUST W OF FRANCE AVEIN BLOOMINGTON-MILL & OVERLAY, CONSTRUCT WB AUXLANE FROM PORTLAND AVE TO NICOLLET AVE, MEDIANBARRIER, DRAINAGE, RETAINING WALLS & TMS5.3 RS MILL ANDOVERLAYIM <strong>15</strong>,1<strong>15</strong>,000 13,603,500 00 1,511,500 01872 I 494 2785-378 MN/DOT XERXES AVE BRIDGE OVER I-494 IN BLOOMINGTON-REPLACE BRIDGE #9126 AND APPROACH PANELS. ALSOINCLUDES RECONSTRUCTION OF XERXES AVE (JUST TOTHE NORTH AND SOUTH OF THE BRIDGE) ANDSOUTHTOWN BLVD (JUST EAST AND WEST OF THEINTERSECTION WITH XERXES AVE)0.0 BR BRIDGEREPLACEMENTIM 6,835,000 6,<strong>15</strong>1,500 00 683,500 01873 I 494 2785-388 MNDOT **TED** AT 34TH AVE S IN BLOOMINGTON -INTERCHANGE 0.4 AM GRADE AND BF 6,000,000 0 00 0 6,000,000CONSTRUCTION (TED INTERCHANGE FUNDS)SURFACESeptember 2011Project Listing Page III - 141 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!