12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 2Fiscal Year: 2014<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other303 CSAH 17 068-617-006 ROSEAU COUNTY FROM CITY OF ROOSEVELT, NORTH TO 2.4 MI S OF LAKE 3.6 RC GRADE AND STP 1,430,240 1,070,000 00 0 360,240OF THE WOODS CSAH 11, RECONSTRUCTION (TIED WITHSURFACE39-617-08)304 CITY 119-103-004 EAST GRAND EAST GRAND FORKS - TH 2 & 5TH AVE NW INTERSECTION 0.0 RC GRADE AND STP 1,880,020 737,880 00 0 1,142,140FORKS UPGRADESURFACE305 MN 9 5410-22 MNDOT BETWEEN BORUP & THE CITY OF BELTRAMI - LOW SLUMP 0.0 BI BRIDGE OVERLAY STP 1,350,000 1,080,000 00 270,000 0OVERLAY ON BR NO., 60008, 54003, 54002, & 54001306 MN 11 3501-14 MNDOT E END BR 6690 OVER THE RED RIVER TO KARLSTAD, 28.5 RS MILL AND INLAY STP 6,000,000 4,800,000 00 1,200,000 0RESURFACING307 MN 11 6802-27 MNDOT ROSEAU CSAH <strong>15</strong> TO E MN89 IN ROSEAU, BITUMINOUS 3.0 RD BITUMINOUS STP 1,300,000 1,040,000 00 260,000 0RECLAIMRECLAMATION308 MN 11 6804-23 MNDOT **FMB** IN SWIFT - IMPROVE OUTLET DRAINAGE CHANNEL 0.0 RX CHANNELIZATION BF 500,000 0 00 0 500,000309 US 59 3505-17 MNDOT NORTH OF LANCASTER, REPLACE BR 68770.0 BR BRIDGESTP 1,250,000 1,000,000 00 250,000 0REPLACEMENT310 US 59 5705-58 MNDOT **FMB** IN THIEF RIVER FALLS - REPAIR BR 53270.0 BI BRIDGE REPAIR BF 1,600,000 0 00 0 1,600,000311 US 59 6303-37 MNDOT US59, NEAR PLUMMER - UPGRADE GATES0.0 SR RAILROADRRS 250,000 225,000 00 25,000 0SIGNALS312 US 75 6011-24 MNDOT BETWEEN CROOKSTON & ANGUS, REPLACE BR NO., 8392, 0.0 BR BRIDGESTP 2,200,000 1,760,000 00 440,000 03958, 8393, 8394, 3959, & 4463REPLACEMENT313 US 75 6011-26 MNDOT S OF POLK CSAH 19 TO S OF MN1 IN WARREN,16.1 RS MILL ANDSTP 3,750,000 3,000,000 00 750,000 0RESURFACINGOVERLAY314 MN 92 6304-12 MNDOT MN32 TO US59 IN BROOKS, RESURFACING13.0 RS MILL ANDSTP 3,300,000 2,640,000 00 660,000 0OVERLAY3<strong>15</strong> MN 92 6304-13 MNDOT 3.0 MI W OF BROOKS, REPLACE BR 68300.0 BR BRIDGESF 850,000 0 00 850,000 0REPLACEMENT316 MN 175 3516-19 MNDOT 3.4 MI. E. OF US75 & 3.7 MI. E. OF US75, REPLACE BR 35509 0.0 BR BRIDGESTP 2,190,000 1,752,000 00 438,000 0(NEW BR 35003) & BR 35510 (NEW BR 35004)REPLACEMENT317 MN 200 5407-28 MNDOT S OF TH 200 (TWP RD OVER MARSH RIVER) REPLACE BR 0.0 BR BRIDGEBF 500,000 0 00 250,000 250,0006522, (NEW BR 54X05)REPLACEMENT318 MN 999 8822-123 MNDOT **ELLA** DISTRICTWIDE CULVERT REPAIR0.0 NA CULVERT REPAIR SF 775,000 0 00 775,000 0September 2011Project Listing Page III - 26 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!