12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 7Fiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1208 US 169 2207-32 MNDOT RECONSTRUCT IN BLUE EARTH (FARIBAULT CO) FROM S 3.5 RC GRADE AND STP 7,236,000 5,789,000 00 1,447,000 0LIMITS AT 14TH ST N TO JCT CSAH 6, ROUNDABOUTSURFACE1209 MN 999 8827-97 MNDOT VARIOUS BRIDGES ON TH 22 & I 90, BRIDGE PAINTING 0.0 BI PAINT BRIDGE STP 1,711,000 1,369,000 00 342,000 01210 MN 999 8827-<strong>15</strong>5 MNDOT DISTRICTWIDE SIGNAL REPAIR AND INSTALL0.0 ST TRAFFIC SIGNAL SF 425,000 0 00 425,000 0INTERCHANGE LIGHTING ON TH 60REVISION1211 MN 999 8807-ADA-13 MNDOT **ADA** SETASIDE FOR ADA PROJECTS - 20130.0 SC PED./BIKESTP 160,000 130,000 00 30,000 0IMPROVEMENT1212 MN 999 8807-RW-13 MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY - 20130.0 RW RIGHT OF WAY SF 3,000,000 0 00 3,000,000 01213 LOCAL 999 8807-SAS-13 MNDOT DISTRICTWIDE SETASIDES - 20130.0 NA MISCELLANEOUS STP 10,100,000 2,400,000 00 7,700,000 01214 LOCAL 999 8807-SHL-13 LOCAL SETASIDE FOR LOCAL HSIP PROJECTS - 20130.0 SH SAFETY TARGET HSIP 804,445 724,000 00 0 80,445$63,221,876 $31,324,110 $<strong>15</strong>,616,000 $1,342,000 $20,989,200 $9,566,566September 2011Project Listing Page III - 93 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!