12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 3Fiscal Year: 20<strong>15</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other627 CSAH 120 073-720-002AC STEARNS COUNTY SAFETY IMPROVEMENTS FROM 500 FEET WEST OF 50TH 0.5 SC MEDIAN BARRIER STP 1,000,000 1,000,000 00 0 0AVENUE TO CONNECTICUT AVENUE IN SARTELL (ACPAYBACK 1 OF 1)628 PED/BIKE 999 162-090-006 ST. CLOUD BEAVER ISLAND TRAIL EXTENSION FROM 33RD STREET 1.0 EN PEDESTRIAN TEA 600,000 388,000 00 0 212,000SOUTH TO MISSISSIPPI RIVER BLUFFS REGIONAL PARKBIKE TRAILIN THE CITY OF ST. CLOUD629 PED/BIKE 999 204-090-003 ELK RIVER CONSTRUCT MISSING SEGMENTS OF BIKE/PED TRAILALONG TWIN LAKES ROAD FROM EXISTING HOUSINGDEVELOPMENTS IN ELK RIVER TO THE ELK RIVERNORTHSTAR COMMUTER RAIL STATION AND UPGRADEPED. RAMPS TO ADA GUIDELINES1.0 EN PED./BIKEIMPROVEMENTTEA 222,500 160,000 00 0 62,500630 LOCAL 999 213-126-001 BUFFALO ON NEW ALIGNMENT TH 25 TO TH 55, CONSTRUCT0.5 MC GRADE AND STP 1,960,000 1,081,000 00 0 879,000SETTLERS PARKWAY ON THE SOUTH SIDE OF BUFFALOSURFACE631 LOCAL 999 218-080-002 CAMBRIDGE RECONSTRUCT FROM TH 95 TO CR 45 IN CAMBRIDGE 1.0 RC GRSU - GRADE STP 2,292,500 1,000,000 00 0 1,292,500AND SURFACE632 LOCAL 999 220-117-002AC2 SARTELL GRADING, AGG BASE, BITUMINOUS SURFACING,CONCRETE CURB AND GUTTER, ROUNDABOUTS, STORMSEWER AND WATER MAIN FOR 50TH AVE FROM JCT. CR120 AND 50TH AVE TO 0.429 MI. N OF 50TH AVE (ACPAYBACK, 2 OF 2)0.4 MC GRADE ANDSURFACESTP 192,000 192,000 00 0 0633 MN 4 7301-35 MNDOT REPLACE BRIDGE #5917 OVER SAUK RIVER, 1.1 MI S OF I- 0.2 BR BRIDGESF 1,852,464 0 00 1,852,464 094REPLACEMENT634 US 10 0502-103AC MNDOT BENTON CO. CSAH 4 TO 0.2 MI. W. OF RAILROAD5.7 RC UNBONDED NHS 7,025,000 7,025,000 00 0 0CROSSING IN ST. CLOUD, UNBONDED CONCRETECONCRETEOVERLAY (AC PAYBACK 1 OF 1)OVERLAY635 US 12 8601-58 MNDOT MONTROSE TO DELANO, MILL AND OVERLAY7.2 RS MILL ANDNHS 1,710,792 1,368,634 00 342,<strong>15</strong>8 0OVERLAY636 MN 18 4805-08 MNDOT TH 47 E TO MILLE LACS/AITKIN CO LINE, MILL AND3.3 RS MILL ANDSTP 866,362 693,090 00 173,272 0OVERLAY (ATP-3 PORTION)OVERLAY637 MN 23 7305-117 MNDOT CONSTRUCT R-CUT INTERSECTION AT STEARNS CR <strong>15</strong>8 0.0 SC TURN LANES SF 550,000 0 00 550,000 0COLD SPRING GRANITE638 MN 25 8605-49 MNDOT RECONSTRUCT FROM 7TH ST TO 0.5 MI N OF WRIGHT CO 2.2 RC GRADE AND STP 5,000,000 4,000,000 00 1,000,000 0CR 138 IN BUFFALO, UPGRADE TRAFFIC SIGNALSURFACE639 MN 27 4904-41 MNDOT 127TH AVE TO 9TH AVE IN NE LITTLE FALLS, MILL AND 2.1 RS MILL ANDSF 1,163,930 0 00 1,163,930 0OVERLAYOVERLAYSeptember 2011Project Listing Page III - 51 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!