12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: MFiscal Year: 2014<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1991 US 61 6222-162 MN/DOT FROM 800' S WHITE BEAR AVE TO .25 MI N OF JCT MN96 INWHITE BEAR LAKE - MILL & OVERLAY, DRAINAGE,REPLACE SIGNAL AT BUFFALO ST/4TH ST (SF INCLUDESRR AGREEMENT)1.9 RS MILL ANDOVERLAYSF LF 3,650,000 0 00 3,505,000 145,0001992 MN 62 2775-<strong>15</strong> MNDOT FROM PORTLAND AVE TO BLOOMINGTON AVE IN1.1 SC TRAFFIC SIGNAL SF 125,000 0 00 125,000 0RICHFIELD & MINNEAPOLIS - REPLACE LIGHTING SYSTEMREVISION1993 MN 65 0208-136 MN/DOT AT VIKING BLVD IN HAM LAKE-EXTEND NB & SB LEFT 0.5 SC TURN LANES SF 195,000 0 00 195,000 0TURN LANES1994 I 94 2780-87 MNDOT FROM CROW RIVER IN HASSAN TWP TO FISH LAKE11.0 SC TRAFFIC SIGNAL SF 500,000 0 00 500,000 0INTERCHANGE IN MAPLE GROVE-REPLACE SIGNINGREVISION1995 I 94 2781-438 MNDOT FROM I-694 IN BROOKLYN CENTER TO LOWRY TUNNEL IN 8.6 SC TRAFFIC SIGNAL SF 400,000 0 00 400,000 0MINNEAPOLIS - SIGN REPLACEMENTREVISION1996 I 94 6282-190 MN/DOT PRIOR AVE TO FAIRVIEW AVE, ST PAUL-NOISE WALL 0.3 NO NOISESF LF 995,000 0 00 700,000 295,000CONSTRUCTION ON SOUTH SIDEABATEMENT1997 MN 110 1918-108 MNDOT AT DAKOTA CR 43 (LEXINGTON AVE) IN MENDOTA0.0 SC TRAFFIC SIGNAL SF LF 250,000 0 00 125,000 125,000HEIGHTS-REPLACE TRAFFIC SIGNALREVISION1998 US 169 2772-90 MNDOT FROM I-494 IN BLOOMINGTON/EDINA TO I-94 IN MAPLE <strong>15</strong>.6 SC TRAFFIC SIGNAL SF 750,000 0 00 750,000 0GROVE/BROOKLYN PARK-REPLACE SIGNINGREVISION1999 US 169 2772-91 MN/DOT FROM JUST N OF JCT I494 IN BLOOMINGTON TO JUST NJCT MN 62 IN EDINA-MILL & OVERLAY, CRACK & SEAL OLDCONCRETE, CONSTRUCT ESCAPE LANE, GUARDRAIL,DRAINAGE2.4 RS MILL ANDOVERLAYNHS 4,780,000 3,824,000 00 956,000 02000 US 169 2772-92 MN/DOT FROM N END OF BRIDGE OVER TH55 IN PLYMOUTH TO 0.2MI S OF 77TH AVE (BROOKLYN BLVD) IN BROOKLYNPARK-MILL & OVERLAY, CRACK & SEAT OLD CONCRETE,CONSTRUCT ESCAPE LANE, GUARDRAIL, DRAINAGE7.5 RS MILL ANDOVERLAYNHS 13,725,000 10,980,000 00 2,745,000 02001 US 169 7005-94 MN/DOT THROUGH BELLE PLAINE - REMOVE MEDIAN26.0 TM SPOTSF 500,000 0 00 500,000 0CROSSOVERS (HIGH PRIORITY IRC)IMPROVEMENT2002 US 169 7005-97 MNDOT **SAM** AT SCOTT COUNTY ROAD 69 - INTERCHANGE 0.7 AM BRIDGEBF <strong>15</strong>,400,000 0 00 0 <strong>15</strong>,400,000CONSTRUCTION (SAM INTERCHANGE BONDS)REPLACEMENT2003 US 169 7005-102 MNDOT **BP08**AT MARSCHALL ROAD IN SHAKOPEE-PARK AND 0.0 AM GRADE AND BF 1,169,800 0 00 0 1,169,800RIDE (CHP <strong>15</strong>2 TRANSIT ADVANTAGE BONDS)SURFACE2004 I 494 1985-137 MN/DOT EASTBOUND LANES FROM PIEPER ROAD BRIDGE IN2.8 RS MILL ANDSF 1,660,000 0 00 1,660,000 0INVER GROVE HTS TO I35E IN MENDOTA HTS-MILL &OVERLAYOVERLAY, DRAINAGESeptember 2011Project Listing Page III - <strong>15</strong>1 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!