12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: 7Fiscal Year: <strong>2012</strong><strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other1122 PED/BIKE 165-090-004 ST PETER TRAIL FROM BROADWAY/GARDNER ST TO0.7 EN PEDESTRIAN TEA 210,000 118,440 00 0 91,560NICOLLET/JEFFERSON ST IN THE CITY OF ST PETERBIKE TRAIL(FED$CAPPED)1123 US 59 177-010-003 WORTHINGTON I 90 AND MN 59 EXPANSION FOR BUSINESS/INDUSTRIAL 0.0 MC GRADE AND SF 4,720,000 0 00 100,000 4,620,000PARK (ASSOC. 5304-37)SURFACE1124 MSAS 111 177-111-002 WORTHINGTON IN THE CITY OF WORTHINGTON ON COLLEGEWAY FROM 0.4 RC GRADE AND STP 761,030 493,000 00 0 268,030THOMPSON AVE TO CSAH 10 (NOBLES CO),SURFACERECONSTRUCT (FED$CAPPED)1125 MN 4 8302-33 MNDOT 7.2 MI N. OF ST JAMES OVER WATONWAN RIVER & 5. 9 MI 1.6 BR BRIDGESTP 2,230,000 1,783,000 00 447,000 0N. OF ST JAMES OVER DITCH (WATONWAN CO), REPLACEREPLACEMENTBRS 8832, 6762, 67861126 MN 13 4002-48 MNDOT CONSTRUCT CONTINUOUS TWO WAY RIGHT TURN LANEAND TWO RIGHT TURN LANES IN FRONT OF THEMONTGOMERY-LONSDALE HIGH SCHOOL INMONTGOMERY0.5 SC TURN LANES STP 600,000 480,000 00 120,000 01127 US 14 5203-85 MNDOT **RFP** INTERSECTION OF US 14 AND NICOLLET COUNTY 2.6 MC GRADE AND SF BF LF 18,000,000 0 00 2,000,000 16,000,000CSAH 41, INTERSECTION IMPROVEMENTS (DESIGN BUILD)BRIDGE1128 US 14 8103-56 MNDOT <strong>FINAL</strong> LANDSCAPING & SEEDING AT THE TH 14 &10.0 RB LANDSCAPING NHS 200,000 160,000 00 40,000 0WASECA COUNTY CSAH 3 INTERCHANGE AT JANESVILLE1129 US 14 8103-56 MNDOT **MN002** FROM WASECA TO OWATONNA, <strong>FINAL</strong>10.0 RB LANDSCAPING TCSP 564,113 451,290 00 112,823 0LANDSCAPING & SEEDING1130 MN <strong>15</strong> 5204-112 MNDOT **BR4M** FROM END OF TRUCK CLIMBING LANE AT NEW <strong>15</strong>.7 RS BITUMINOUS STP 7,952,000 6,361,600 00 1,590,400 0ULM HILL TO 0.33 MI S. OF JCT TH 19, OVERLAYOVERLAY1131 MN <strong>15</strong>/60 8304-113 MNDOT **BR4M** FROM W JCT TH <strong>15</strong>/60 TO E JCT TH 60/<strong>15</strong>, CPR 5.8 RD CONCRETE STP 6,161,000 4,928,800 00 1,232,200 0AND CONCRETE PLANNINGPVMNT SURFPLNG1132 MN 19 7013-03 MNDOT FROM 1700' W OF THE E JCT TH 13 TO THE E JCT OF TH 0.4 RS MILL ANDSF <strong>15</strong>0,000 0 00 <strong>15</strong>0,000 013, MILL & OVERLAY (BARC)OVERLAY1133 MN 22 0704-86 MNDOT BANK STABILIZATION ALONG LE SUEUR RIVER IN BLUE 0.0 DR EROSION REPAIR SF 540,800 0 00 540,800 0EARTH CO1134 MN 22 4012-33 MNDOT CONSTRUCT RIPRAP PLUNGE POOL AT BR# 40X02 AT 0.0 DR CULVERT REPAIR SF 25,000 0 00 25,000 0THE INTERSECTION OF LE SUEUR CR 102 NEAR KASOTA(BARC)1135 MN 22 4306-<strong>15</strong> MNDOT **ELLA**FROM N. CITY LIMITS OF GAYLORD TO S. OF JCT. 11.5 RS MILL ANDSTP 2,386,063 1,908,850 00 477,213 0TH 212 IN SIBLEY CO MILL & OVERLAY (ASSOC. 7208-31)OVERLAYSeptember 2011Project Listing Page III - 87 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!