12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATP: 6Fiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other954 PED/BIKE 085-591-003 WINONA COUNTY **SRTS** PE FOR PATH FROM BENSON DRNEIGHBORHOOD TO SCHOOL AND SAFETYIMPROVEMENTS TO CROSSINGS AND ROUTEDESIGNATION (SEE 085-591-004 FOR CONST PROJ)0.0 BT PEDESTRIANBIKE TRAILSRTS 8,100 8,100 00 0 0955 PED/BIKE 085-591-004 WINONA COUNTY **SRTS**LEWISTON - CE AND CONSTRUCTION OF PATHFROM BENSON DR NEIGHBORHOOD TO SCHOOL ANDSAFETY IMPROVEMENTS TO CROSSINGS AND ROUTEDESIGNATION0.0 BT PEDESTRIANBIKE TRAILSRTS 93,400 93,400 00 0 0956 PED/BIKE 092-090-047 DNR MILL TOWNS TRAIL - BRIDGE0.1 EN ENHANCEMENT TEA 665,000 532,000 00 0 133,000957 PED/BIKE 104-090-006 AUSTIN NATURE CENTER TRAIL - PHASE III0.7 EN ENHANCEMENT TEA 270,490 216,392 00 0 54,098958 MUN 104-101-005 AUSTIN 8TH AVE NE - 8TH ST TO IC&E RR - GRADE & SURFACE 0.2 RC GRADE AND STP 500,000 400,000 00 0 100,000SURFACE959 MUN 104-123-007 AUSTIN 8TH STREET NE - 8TH AVE TO 10TH AVE - GRADE &0.1 RC GRADE AND STP 225,000 180,000 00 0 45,000SURFACESURFACE960 MUN <strong>15</strong>9-106-018 ROCHESTER 2ND ST SW CONCRETE PAVEMENT FROM 11TH AVENUE 0.4 RS CONCRETE STP 3,500,000 2,500,000 00 0 1,000,000SW TO 6TH AVENUE SWOVERLAY961 MUN <strong>15</strong>9-123-007 ROCHESTER 16TH ST SE CONCRETE PAVEMENT FROM TH 63 TO 3RD 0.3 RS CONCRETE STP 2,200,000 1,100,000 00 0 1,100,000AVENUE SEOVERLAY962 PED/BIKE 236-090-001 LA CRESCENT WAGON WHEEL TRAIL, PHASE 11.0 EN PEDESTRIAN TEA 545,500 436,400 00 0 109,100BIKE TRAIL963 TH 14 5501-35AC MN/DOT HEAVY BIT. OVERLAY FROM CSAH 5 (BYRON) TO TH 52 - 16.1 RS BITUMINOUS NHS 4,400,000 4,400,000 00 0 0AC PAYBACK 1 OF 1OVERLAY964 TH 14 8501-61 MN/DOT **ELLA**FMP** BITUMINOUS MILL & OVERLAY FROM W. 21.9 RS MILL ANDNHS BF 6,856,700 5,040,000 00 1,260,000 556,700JCT. T.H. 74 TO T.H. 61OVERLAY965 TH 44 2308-26 MN/DOT BITUMINOUS MILL & OVERLAY FROM JCT. T.H. 52 TO E.CITY LIMITS OF SPRING GROVE AND REPLACE 5 BOXCULVERTS - BRIDGES 4148, 4149, 4<strong>15</strong>0, 4<strong>15</strong>1 AND 8163(AC PROJECT, PAYBACK IN 2014)13.3 RS MILL ANDOVERLAYSTP 2,600,000 0 2,400,0000 2,600,000 0966 TH 44 2804-33 MN/DOT **ELLA**FMP** BITUMINOUS MILL & OVERLAY FROM 0.142MI W OF CSAH 12 (CALEDONIA) TO 0.2 MI E OFBUTTERFIELD ROAD (HOKAH) AND REPLACE BOXCULVERT - BRIDGE 8<strong>15</strong>8 (NEW BRIDGE 28X07)13.1 RS MILL ANDOVERLAYSTP BF 5,964,069 4,714,455 00 818,614 431,000967 TH 52 2506-52 MN/DOT **SAM**CANNON FALLS INTERCHANGE - 20.64M2.9 MC GRADE,SF BF LF 22,740,201 0 00 3,900,201 18,840,000Construction, 3.58M R/W, .32M Consultants, 12.84M SAMSURFACE &Funds,September 2011Project Listing Page III - 75 of 172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!