12.07.2015 Views

FINAL 2012-15 STIP

FINAL 2012-15 STIP

FINAL 2012-15 STIP

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATP: GRAND FORKS-EAST GRAND FORKS METROPOLITAN PLANNING ORGANIZATIONFiscal Year: 2013<strong>STIP</strong> for FY <strong>2012</strong>-20<strong>15</strong>Seq #RouteSystem Project Number Agency Description Miles ProgramType of WorkProposedFundsTotalFHWA AC FTA TH Other240 BB TRF-0018-13A EAST GRAND FORKS SECT 5307: EAST GRAND FORKS DAR TRANSIT0.0 B9 OPERATE BUS LF 72,000 0 00 0 72,000OPERATING ASSISTANCE241 BB TRF-0018-13B EAST GRAND FORKS SECT 5307: EAST GRAND FORKS FIXED ROUTE TRANSIT 0.0 B9 OPERATE BUS FTA 260,000 0 0 97,000 0 163,000OPERATING ASSISTANCE242 BB TRF-0018-13C EAST GRAND FORKS SECT 5307: EAST GRAND FORKS TRANSIT SHELTER 0.0 B9 BUS GRANT FTA 40,000 0 0 32,000 0 8,000CAPITALIMPROVEMENT265 PED/BIKE 119-010-005 EAST GRAND FORKS EAST GRAND FORKS - MULTIPURPOSE TRAIL ON W SIDE 0.9 EN PEDESTRIAN TEA 255,340 204,272 00 0 51,068OF MN220 FOR PED/BIKE TRAILBIKE TRAIL279 MN 220 6016-37 MNDOT **ELLA** W LIMITS OF CLIMAX TO E JCT US2,23.6 RS MILL AND STP 4,900,000 3,920,000 00 980,000 0RESURFACINGOVERLAY$5,527,340 $4,124,272 $0 $129,000 $980,000 $294,068September 2011MPO Project Listing A-1 Page 8 of 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!