Table 6.3 SUMMARY OF HIGHWAY PORJECT EVALUATIONConstr 1ProjectCost($M)Major ProjectsIsland Eastern Corridor Link293Route 7 (Kennedy Town-Aberdeen)475Route 7 (Sai Ying Pun-K. Town) 41 005Central-Wan Chai Bypass1460Route (Western Harbour Crossing)3505Route 3 (West Kowloon Expressway) (South) 5228Route 3 (West Kowloon Expressway) (North) 6 1 .019Hung Horn Bypass372Second Airport Tunnel400Route 3 (Yau Kom Tau-Yuen Long)2 856Route 3 (Kwai Chung-Yau Kom Tau)3,278Route 16695Sub-total 16586Medium ProjectsSecond Ap Lei Chau Bridge263Boundary Street (East) Flyovers133Boundary Street (West) Flyovers242Waterloo Road Flyover133Jordan/Gascoigne Road Flyovers184Lung Cheung Road 7262Chatham Road Flyover102Man Kam To-NTCR Connector116Texaco Road Flyover144Fan Kam Road Widening145Kwai Chung Circumferential Road131Route 5 (Shek Wai Kok-Chai Wan Kok)228Road T4—Sha Tin177Castle Peak Road Widening218Sub-total 2478Minor ProjectsGloucester Road Flyover21Smithfield Extension84Lung Cheung Road Flyover60Nam Cheong Street Widening12Tai Po Road Flyover54Ching Cheung Road Widening67Hiram's Highway44Kam Tin Road Widening95Lam Kam Road Widening86NT Circular Road Widening33Kam Tin Bypass (Phase 2)28Hang Hau Road ImprovementRoute Twisk 8 58 7Sub-totalTotal64919713SYRR 2Recommended Strategy1996 200124 hr pcu PkV/C 3 24 hr pcu(000) (000)M 38M L 43M HHH 779186M 83HHHL 4321H 36L 81H L H51M6MMLLHHHHMHLLLMML81 16312918505848 17260.60.60.60.90.50.80.40.80.70.80.60.11.00.70.90.50.60.70.80.40.21.2Pk V/C 386 0.970 0.7124 1.0112 0.8143 1.01601.1141 0.9102 0.691 1.092 0.8104 0.848 0.747 0.523 0.918 0.447 0.997 0.9142 1.058 0.428 0.446 0.611 0.214 0.734 0.671 0.834 0.681 1.022 1.250 1.034 0.511 0.694 0.623 0.651 0.758 0.774 0.612 0.226 1.016 0.8Notes:12345678In 1988 prices; land costs excluded.Economic Single Year Rate <strong>of</strong> Return (SYRR) at year <strong>of</strong> operation which was taken as 1996 for all projects forevaluation purposes only. Return classified as follows:L = Low 8%<strong>The</strong> higher V/C ratio <strong>of</strong> the two directional flows in the morning peak.Includes Belcher's Bay link.South <strong>of</strong> Tonkin Street. Costs assume at-grade facility.North <strong>of</strong> Tonkin Street Includes South Kwai Chung Road Improvements, Phases II and III. Also includes proposedMei Foo Bypass (in 1996 only).Includes 3 improvement projects from Butterfly Valley Interchange to Waterloo Road Interchange.This project is included in the construction programme but not evaluated economically.104

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!