12. FUEL OIL SYSTEM AND HANDLING FACILITIES12.1 Fuel systemAt present HSD (High Speed Diesel) will be used as fuel along with natural gasfuel. So provision of dual fuel system (Liquid fuel system and natural gas fuelsystem) shall be made in the fuel system of gas turbine unit.12.1.1 Liquid Fuel oil systemThe unit shall be provided with liquid fuel oil system. The liquid fuel oil systemshall have the necessary heating arrangement, pressure regulating valves, shutoffvalves, pipes, pumps, metering device, pressure gauge and other indicatinginstruments. The liquid fuel system shall be provided with necessary protectiveequipment for proper control and safe operation of the unit.The distillate fuel oil system shall consist of two pumps (One standby, oneoperative) of suitable capacity for the maximum output of the turbine at lowestambient temperature at the site, along with necessary valves, piping, regulatingdevices, metering device, instrumentation, pressure switches and indicators.Scope of supplyOne distillate fuel supply system shall include, at least, the following equipment:-One off-base standardized forwarding skid consisting of the pumping andregulating equipment- One off-base standardized filtering (duplex cartridge type filterss) located nearthe unit-Piping between forwarding and filtering skid and from the filtering skid up to thegas turbine unit-Unloading Fuel skid-2 (Two) 50.00 lakh litre distillate fuel storage tank with fixed roof having floatingsuction type delivery (if existing tanks are not serviceable)-Piping from unloading area to fuel tank.-For unloading: Two 100% (100m 3 /h) transfer pumps + Filters-Piping between the 50.00 lac fuel storage tank and pumping skid-Fuel strainers-Flowmeter and totalise to measure fuel consumption-Pressure gauges on each side of fuel strainers, at pump suctions and discharge,and other critical points- Fuel oil pumps-Over speed and emergency trip stop valves-Control valves for starting and operating-Necessary isolation valves-All piping-Automatic control valvesGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!