12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The creepage distance of bushings of outdoor use transformer except neutralbushing shall not be less than 25 mm / KV of rated phase to phase voltage.(3) Oil Preservation SystemOil immersed transformers shall be provided with an oil preservation system inwhich the insulating oil shall be isolated from atmospheric air. The oil preservationsystem shall be of the diaphragm seal or air seal cell type conservator with silicagelbreather. Oil level gauge with low level alarm contact shall be mounted on theconservator.(4) Cooling systemAn adequate number of unit coolers shall be fixed to the tank of oil immersedtransformers, and the cooling capacity shall be sufficient to operate thetransformer under the rated power. The coolers shall be of such structure that willnot be affected by the vibration of transformer. A valve shall be provided witheach pipe connecting a unit cooler to the tank. Fixing bolts and terminals shall besuch that will never get loosened after being fastened. The power source of thecooling fans shall be 415 V, 3 phase or 240 V, single phase. The fans shallnormally be controlled by its own winding temperature relaying device.(5) Temperature DetectorOne (1) temperature detector shall be installed at the point where the highesttemperature is anticipated.(6) Protective DeviceThe following protection system shall be provided:- Buchholz relay and Pressure Relieve Device (PRD) similar type for alarmand trip- High temperature alarm and trip (winding and oil)A Buchholz relay or oil pressure relay shall be fitted on between the conservatorand the tank. A dial type thermometer with hand resetting maximum indicatorshall be provided. A Pressure Relief Device (PRD) with operation indicator shall beprovided.The gas relay should be provided with double float (one operated by volume ofgas flow and other operated by mass gas flow). It should have followingprovision:a. Gas release valveb. Mechanical test buttonc. Provision for testing both the floats by injecting air from outside.d. Drain cocke. Transport graduated windowf. The relay should be mounted at such a place that can be visible fromthe ground without climbing on the transformer.(7) WiringAll wiring mounted on the transformer shall be drawn through conduit pipes oradequate protective tubes to the control cabinet which shall be properly locatedon the transformer.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!