12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The distillate fuel oil system shall consist of two pumps (One standby, oneoperative) of suitable capacity for the maximum output of the turbine at lowestambient temperature at the site, along with necessary valves, piping, regulatingdevices, metering device, instrumentation, pressure switches and indicators.Scope of supplyOne distillate fuel supply system shall include, at least, the following equipment:-One off-base standardized forwarding skid consisting of the pumping andregulating equipment- One off-base standardized filtering (duplex cartridge type filters) located nearthe unit-Piping between forwarding and filtering skid and from the filtering skid up to thegas turbine unit-Unloading Fuel skid-2(Two) 50.00 lac litre distillate fuel storage tank with fixed roof having floatingsuction type delivery-Piping from unloading area to fuel tank.-For unloading: Two 100% (100m 3 /h) transfer pumps + Filters-Piping between the 50.00 lac fuel storage tank and pumping skid- Rehabilitation of existing fuel unloading facilities including jetty.-Fuel strainers-Flow-meter and totalise to measure fuel consumption-Pressure gauges on each side of fuel strainers, at pump suctions and discharge,and other critical points- Fuel oil pumps-Over speed and emergency trip stop valves-Control valves for starting and operating-Necessary isolation valves-All piping-Automatic control valvesScope of workThe contractor shall design, manufacture, inspect, test, deliver to the site andinstall of liquid fuel oil handling, conditioning and regulating facilities with allaccessories as specified hereunder for the plant.The unit shall be furnished with a complete liquid fuel oil system. The liquid fueloil handling system shall also be provided.1. Fuel forwarding skidFuel forwarding skid brings liquid fuel to the gas turbine at a pressure consistentwith the gas turbine fuel supply requirements.Equipment list:-Two (2) 100% fuel forwarding AC motor driven centrifugal pumps (one duty, onestandby), each for the maximum fuel flow necessary to the gas turbine-Three suction StrainersGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!