e deemed an acceptance of any equipment.16.5 FIRST INSPECTION16.5.1 RESPONSIBILITY DURING GUARANTEE PERIODThe Contractor shall be responsible for operation during the period commencingwith initial start-up and extending through trial operation and all performancetests. The Contractor shall also be responsible for two(2) years operation andmaintenance after satisfactory performance test by providing supervisory staff ofthe required number to be fixed by the Board. During the trial operation period,the Contractor will furnish the supervisory operating personnel; In addition, anycalibration device, special test instruments, etc., required preparing for andconducting the performance tests.Contractor's supervisory personnel shall conduct instruction sessions in Englishlanguage for the <strong>BOARD</strong>'s personnel prior to and during this period and shallotherwise train them so that they will be able to operate and maintain the newequipment satisfactorily after acceptance by the Board. The training programmeof <strong>BOARD</strong>'s personnel shall be conducted to meet the satisfaction of the Board &Engineer. The Contractor shall provide the service of competent personnelknowing English language to assist the <strong>BOARD</strong>'s engineers in training the staff.16.5.2 FIRST INSPECTIONThe first Inspections after the completion of recommended hours of operationshall be undertaken by the Contractor and the charges on this account Includingall corrections, repairs and replacements made by him shall be entirely at his owncost.For the first inspection the Contractor will provide the supervisors with specialtools and the Board will provide labour, normal tools, crane with driver under theresponsibility of the Contractor. Fuels, lubricants and wages for the local staff forcrane will be paid by the Contractor.First inspection will in any case be carried out before expiry of the guaranteeperiod of twenty four(24) months, according to a programme to be mutuallyagreed between the Contractor and the Board. The scope of first inspection willinclude, but will not be limited to, the item specified in Appendix-2.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)153

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!