12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

18.6.4 PrimingAll joinery, metal works to be painted shall be primed using appropriate andapproved primer before delivery assembly or fixing. No primer is required onsurfaces to be distempered or emulsion painted unless otherwise specified.18.6.5 Number Of CoatsUnless otherwise specified, the required finishes shall consist of the followingtreatments, in addition to preparation, priming etc:-a. Distempering Two coatsb. Emulsion painting Two coatsc. Oil painting Three coats on woodworkTwo coats on elsewhere18.6.6 StorageThe Contractor shall furnish an exclusive place for storing the combustible paints.The place for storage shall be fully ventilated. Adequate measures shall be takenagainst the ingress of dust and direct rays of the sun.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)207

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!