12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

-One fuel pressure regulating valve-One relief valve-Complete set of piping including valves, gauges and fittings of all linesterminating at the skid boundary2. Fuel oil filters SkidThis unit provides liquid fuel filtration up-stream the unit turbine and includes thefollowings:-Two fuel filters (one duty, one standby) : Filter cartridge -5 microns-One pressure metering panel board including : one manostat (fuel pressurecontrol), one different pressure gauge-One fuel accumulator-One stop valve-Complete set of piping including valves, gauges and fittings of all linesterminating at the skid boundary3. Fuel storage tankThe fuel storage tank is a vertical with fixed roof tank. Its capacity of each tankshall be minimum 50.00 lac litre. The fuel storage tank will be assembled in siteand includes the followings:-One fuel inlet flange-One fuel outlet flange with floating suction-Two manholes located in shell and in roof-Two foam chambers for fire protections-One visual level gauge-Various levels switch to provide alarm at subsequent level-one gas vent-One water drain-One spiral stairway and one top peripheral hand railing4. Unloading Fuel skidRequired piping, along with, other facilities that will be required for the systemfrom unloading base to the fuel tank to be constructed for the proposed plantshall be made by the contractor.The unloading fuel skid includes the followings-2x100% fuel screw pumps (one running, one standby), capacity of each 100m 3 /h and driven by AC motor.-Two suction strainers-Two headers, each with five unloading points-One flow meter-Piping and valves between above equipment5. Renovation of existing fuel unloading facilitiesRenovation work of the existing facility (fuel unloading jetty, valves & piping, fueltanks ect.) in the power stationGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!