12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Submersible cableFlangesFoundation boltsOther necessary accessories: Required Length: 1 Set: 1 Set17.11 Ducts(7) Data to be submitted with BidsComplete specifications of the supply including the physical dimensions andmaterials used for the principal parts of the supply.Pump discharge capacities, efficiencies, horsepower input and performancecharacteristic curves at various heads on pump settings.Guaranteed brochures, catalogues and other related technical data concerning theoperation of the supply.(8) PipingMaterials and Performance of piping for the work shall be in accordance with theapplicable provisions of the Specification.The concrete ducts to install cables and pipes shall be provided. The ducts shallbe covered with concrete or steel checkered plate, both having enough strength,and shall be provided with the, necessary number of racks for cable and pipes.The thickness of the concrete ducts shall be not less than 18cm, width and depthof ducts shall be more than 40 cm respectively and an appropriate drainagesystem shall be designed within the duct.The Contractor shall submit design drawing to the Board for approval.17.12 FENCING AND GATES, FLAG POLES AND SITE BOUNDARY WALL17.12.1 FencingChain link fencing shall be installed as directed by the Board. The chain linkfencing shall be 2.4 m high with 3 strands of barbed wire at the top, generallycomplying with B.S. 1722 or other approved Standards.Posts and struts shall be fabricated from 100 mm x 100 mm x 6.5 mm thickangles and set in concrete. The struts shall be fitted to all end and corner postsat changes in direction or acute variations in levels and at intervals notexceeding 9 meters in straight lengths of fence. All posts shall be hot dipgalvanised.Prior to the supply and installation, the Contractor shall submit samples offencing materials, structures and colour to be adopted to the Board forapproval.Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)187

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!