12.07.2015 Views

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

BANGLADESH POWER DEVELOPMENT BOARD TENDER ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

from unloading base to the fuel tank to be constructed for the proposed plantshall be made by the contractor.The unloading fuel skid includes the followings-2x100% fuel pumps (one running, one standby), capacity of each 100m 3 /h anddriven by AC motor.-Two suction strainers-Two headers, each with five unloading points-One flow meter-Piping and valves between above equipment12.2.6 Sump tankThe sump tank allows draining liquid fuel from combustion system and fromexhaust plenum when there is false start. It may be preassembled and includesthe followings-One tank of 1 m 3 capacity-One manual pumpGhorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project (Vol-2 of 3)116

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!